Safety information search results
Filter your results
Building or structure type
Materials
Project or lifecycle stage
Design
- BIM (1)
- Computational design (4)
- Design: quality management (7)
- Design calculations (13)
- Design conceptualisation (8)
- Design detailing (12)
- Design drawings (3)
- Design loads (6)
- Design software (6)
- Dynamics (1)
- Fire safety design (3)
- Resilience (4)
- Robustness (9)
- Structural design (13)
- Sustainability (2)
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (8)
- Assessment project [sub-heading only] (6)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (30)
- Excavation (1)
- Extension project (6)
- Fire safety assessment (1)
- New build (5)
- Refurbishment (5)
- Remediation project (6)
- Repair project (4)
- Structural assessment (7)
Method of construction
Elements & systems
- Arch (1)
- Balustrades (1)
- Basements (1)
- Beams (11)
- Bracing (2)
- Cables (1)
- Cladding (2)
- Columns (6)
- Fasteners & connections (9)
- Fire protection (3)
- Foundations (4)
- Insulation (1)
- Light gauge steel framing (1)
- Padstones (1)
- Parapets (1)
- Roofs (5)
- Shear walls (1)
- Signs (1)
- Slabs (5)
- Tendons (1)
- Trusses (2)
- Walls (13)
- Wall ties (2)
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Content type
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (3)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (4)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (27)
- CROSS Newsletter (11)
- CROSS Safety Report (53)
- CROSS Topic Paper (2)
- News [sub-heading only] (6)
CROSS regions
Disproportionate collapse assessment of large panel system buildings
A reporter has become concerned by the approach being taken by some engineers to assess the risk of disproportionate collapse due to fire in large panel system (LPS) buildings.
1 January 2020
CROSS Safety Report
Report ID: 885
Region: CROSS-UK
Structural issues with cladding
A reporter who investigates cladding failures shares common issues they have encountered.
1 April 2020
CROSS Safety Report
Report ID: 904
Region: CROSS-UK
Consequences of low professional fees
An engineer believes that despite public concerns about workmanship issues on site, low professional fees mean that engineers are not able to adequately check the work on site.
1 July 2020
CROSS Safety Report
Report ID: 905
Region: CROSS-UK
Unauthorised structural alterations to accommodate drainpipes
A reporter became aware of cases where main structural steel sections were ‘butchered’ on site to accommodate drainpipes.
1 July 2020
CROSS Safety Report
Report ID: 902
Region: CROSS-UK
Fire protection of mixed hot/cold rolled steel structure
This report describes how a high-rise building had to be remediated after it was found there was insufficient fire protection encasement of structural elements.
1 July 2020
CROSS Safety Report
Report ID: 921
Region: CROSS-UK