Safety information search results
Filter your results
Building or structure type
- Bridges (17)
- Buildings
(103)
- Agricultural buildings (1)
- Car parks (4)
- Commercial (10)
- Consequence Class 3 buildings (2)
- Education, science & art buildings (5)
- Health care (1)
- Higher-risk buildings (1)
- Industrial buildings (1)
- Public, religious & civic buildings (2)
- Recreational buildings (3)
- Residential (26)
- Storage buildings (1)
- Tall buildings (5)
- Theatres & other entertainment buildings (3)
- Transport buildings (1)
- Buried pipes & culverts (1)
- Masts & towers (3)
- Railways (2)
- Reservoirs & dams (1)
- Retaining structures (9)
- Roads (3)
- Sewers (2)
- Temporary structures (9)
Materials
Project or lifecycle stage
Design
- BIM (2)
- Computational design (2)
- Design: quality management (22)
- Design calculations (25)
- Design conceptualisation (10)
- Design detailing (49)
- Design drawings (19)
- Design loads (32)
- Design software (7)
- Dynamics (2)
- Fire safety design (7)
- Resilience (3)
- Robustness (16)
- Structural design (47)
- Sustainability (2)
Fire incident response
Project type
- Alteration & conversion project (9)
- Assessment project [sub-heading only] (5)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (66)
- Demolition project (1)
- Excavation (4)
- Extension project (6)
- Groundworks project (1)
- Maintenance project (1)
- New build (34)
- Refurbishment (7)
- Remediation project (10)
- Repair project (5)
- Strengthening project (3)
- Structural assessment (7)
- Underpinning project (1)
Method of construction
Structural form
Elements & systems
- Arch (1)
- Balconies (2)
- Balustrades (6)
- Basements (3)
- Beams (27)
- Bracing (8)
- Ceilings (4)
- Cladding (17)
- Columns (12)
- Fasteners & connections (52)
- Fire protection (6)
- Foundations (9)
- Insulation (5)
- Light gauge steel framing (2)
- Padstones (2)
- Parapets (3)
- PV panels (1)
- Roofs (24)
- Sandwich panels (1)
- Signs (1)
- Slabs (15)
- Trusses (4)
- Walls (20)
- Wall ties (4)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 2 (4)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 20 (2)
- CROSS-UK Newsletter 24 (2)
- CROSS-UK Newsletter 25 (2)
- CROSS-UK Newsletter 26 (2)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 31 (2)
- CROSS-UK Newsletter 32 (5)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 37 (3)
- CROSS-UK Newsletter 39 (2)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 42 (5)
- CROSS-UK Newsletter 43 (3)
- CROSS-UK Newsletter 44 (4)
- CROSS-UK Newsletter 45 (3)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 49 (2)
- CROSS-UK Newsletter 50 (2)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (4)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 54 (4)
- CROSS-UK Newsletter 55 (4)
- CROSS-UK Newsletter 56 (4)
- CROSS-UK Newsletter 57 (3)
- CROSS-UK Newsletter 58 (3)
- CROSS-UK Newsletter 59 (4)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (3)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (3)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK Newsletter 68 (3)
- CROSS-UK [sub-heading only] (99)
- CROSS Newsletter (62)
- CROSS Safety Alert (1)
- CROSS Safety Report (160)
- CROSS Topic Paper (1)
- News [sub-heading only] (26)
CROSS regions
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Provision for movement in clay brickwork facades
A reporter raises concerns over the detailing and construction of horizontal movement joints in clay brickwork facades.
2 February 2023
CROSS Safety Report
Report ID: 860
Region: CROSS-UK
Brick slips falling from height
A reporter describes cases of brick slips falling from height due to adhesive failures and considers that there is a danger to the public.
13 August 2021
CROSS Safety Report
Report ID: 1017
Region: CROSS-UK
Concern over structural engineers limited appointment
A reporter raises concerns over engineers being appointed only to provide calculations for building regulation approval.
2 February 2023
CROSS Safety Report
Report ID: 831
Region: CROSS-UK
Missing elements from 3D modelling
A reporter shares their experience on how their team consistently discover missing elements when they erect lattice towers and masts that have been 3D modelled.
5 September 2022
CROSS Safety Report
Report ID: 792
Region: CROSS-UK
Questionable temporary works used to retain embankment excavation
This report is about the need for properly engineered retaining walls for all heights of retained materials.
1 June 2022
CROSS Safety Report
Report ID: 806
Region: CROSS-UK
Contractor notches steel transfer beam
A transfer beam with 50mm thick flanges supporting a four-storey building was notched, without approval from the design engineer, to accommodate suspended ceiling fixings.
29 March 2021
CROSS Safety Report
Report ID: 829
Region: CROSS-UK
Professional indemnity insurance issues raise safety concerns
Several reporters have raised concerns in relation to significant cost increases and the introduction of new restrictions on professional indemnity insurance (PII) policies.
13 August 2021
CROSS Safety Report
Report ID: 1022
Region: CROSS-UK
Masonry panels rock in wind due to missing wall ties
Wall ties designed to connect masonry partitions to adjacent steelwork framing were not installed leaving the masonry walls unrestrained. Walls were seen to be rocking in high winds.
17 February 2023
CROSS Safety Report
Report ID: 931
Region: CROSS-UK
Specifying resin by colour causes confusion
A mistake occurred on-site when resin for fixings was selected by colour of packaging rather than by colour of resin. The actual resin used did not reach sufficient strength and the installed fixing failed under a pull test.
10 March 2022
CROSS Safety Report
Report ID: 1068
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.