Safety information search results
Filter your results
Building or structure type
- Bridges (31)
- Buildings
(176)
- Agricultural buildings (2)
- Car parks (4)
- Commercial (10)
- Consequence Class 3 buildings (2)
- Education, science & art buildings (4)
- Health care (1)
- Higher-risk buildings (2)
- Industrial buildings (7)
- LPS buildings (2)
- Public, religious & civic buildings (5)
- Recreational buildings (3)
- Residential (58)
- Stadiums (2)
- Storage buildings (3)
- Tall buildings (7)
- Theatres & other entertainment buildings (1)
- Transport buildings (1)
- Buried pipes & culverts (2)
- Floating structures (1)
- Marine structures (1)
- Masts & towers (7)
- Railways (7)
- Reservoirs & dams (1)
- Retaining structures (14)
- Roads (6)
- Sewers (3)
- Temporary structures (11)
- Tunnels (1)
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (39)
- Assessment project [sub-heading only] (3)
- Conservation & restoration project (2)
- (-) Construction project [sub-heading only] (243)
- Demolition project (15)
- Excavation (15)
- Extension project (19)
- Groundworks project (3)
- Maintenance project (2)
- New build (95)
- Refurbishment (16)
- Remediation project (21)
- Repair project (9)
- Strengthening project (7)
- Structural assessment (7)
- Underpinning project (4)
Elements & systems
- Arch (4)
- Balconies (8)
- Balustrades (9)
- Basements (9)
- Beams (41)
- Bracing (13)
- Canopies (1)
- Ceilings (2)
- Cladding (12)
- Columns (27)
- Fasteners & connections (52)
- Fire protection (4)
- Foundations (27)
- Insulation (4)
- Light gauge steel framing (4)
- Lintels (3)
- Padstones (4)
- Parapets (4)
- PV panels (1)
- Roofs (15)
- Sandwich panels (1)
- Shear walls (3)
- Signs (1)
- Slabs (28)
- Tendons (1)
- Trusses (3)
- Wall head restraints (2)
- Walls (50)
- Wall ties (5)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 1 (4)
- CROSS-UK Newsletter 2 (6)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (4)
- CROSS-UK Newsletter 5 (3)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 9 (2)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (4)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 17 (3)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 19 (3)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 21 (3)
- CROSS-UK Newsletter 22 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 28 (4)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (3)
- CROSS-UK Newsletter 31 (2)
- CROSS-UK Newsletter 33 (3)
- CROSS-UK Newsletter 34 (4)
- CROSS-UK Newsletter 35 (4)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (3)
- CROSS-UK Newsletter 38 (3)
- CROSS-UK Newsletter 39 (3)
- CROSS-UK Newsletter 40 (5)
- CROSS-UK Newsletter 41 (3)
- CROSS-UK Newsletter 42 (3)
- CROSS-UK Newsletter 43 (3)
- CROSS-UK Newsletter 44 (5)
- CROSS-UK Newsletter 45 (3)
- CROSS-UK Newsletter 46 (5)
- CROSS-UK Newsletter 47 (7)
- CROSS-UK Newsletter 48 (3)
- CROSS-UK Newsletter 49 (5)
- CROSS-UK Newsletter 50 (3)
- CROSS-UK Newsletter 51 (5)
- CROSS-UK Newsletter 52 (4)
- CROSS-UK Newsletter 53 (3)
- CROSS-UK Newsletter 54 (4)
- CROSS-UK Newsletter 55 (3)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (7)
- CROSS-UK Newsletter 59 (4)
- CROSS-UK Newsletter 60 (2)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (3)
- CROSS-UK Newsletter 67 (5)
- CROSS-UK Newsletter 68 (4)
- CROSS-UK [sub-heading only] (154)
- CROSS Newsletter (100)
- CROSS Safety Report (242)
- News [sub-heading only] (34)
- Safety information from CROSS [sub-heading only] (1)
CROSS regions
Unstable building due to modification work
A SCOTCROSS report relates to an old four storey building undergoing modifications.
1 February 2007
CROSS Safety Report
Report ID: 69
Region: CROSS-UK
Adapted masonry support props
A reporter has come across adapted masonry support props in use and in their view, they must only be used in the case of limited openings where the masonry can arch over.
1 November 2006
CROSS Safety Report
Report ID: 57
Region: CROSS-UK
Adapted masonry support props
Another reporter gives their experience on the use of adapted masonry support props.
1 November 2006
CROSS Safety Report
Report ID: 58
Region: CROSS-UK
Building Regulations submission for a small house
A reporter who is a small builder shares their experience on inadequate design calculations they received for a small house.
1 January 2008
CROSS Safety Report
Report ID: 91
Region: CROSS-UK
Inadequate underpinning
Works were stopped on site after it was discovered the contractor had completely ignored the specified 5-bay sequence and timing of the underpinning works shown on the design drawings.
1 April 2007
CROSS Safety Report
Report ID: 72
Region: CROSS-UK
Steelwork delivered to site
The contractor on a domestic building project reported that there were deficiencies in steelwork supplied to site.
1 October 2007
CROSS Safety Report
Report ID: 80
Region: CROSS-UK
Further demolition collapse
This report is of an incident that occurred recently in a UK city when a floor suffered a structural collapse during the demolition of a reinforced concrete building.
1 January 2008
CROSS Safety Report
Report ID: 90
Region: CROSS-UK
Demolition risks
This report is about the collapse of a flat slab building that occurred overseas whilst the top floor of the building was being demolished onto the next floor down.
1 January 2008
CROSS Safety Report
Report ID: 96
Region: CROSS-UK
Inadequate foundation reinforcement
Subcontractors carrying out the ground works for a multi-storey development failed to provide sufficient continuity reinforcement in the ground beams.
1 October 2008
CROSS Safety Report
Report ID: 112
Region: CROSS-UK
Lifting bolt failure
A major contractor reported an incident that had occurred in which a threaded eyebolt failed during an operation to lift a section of stonework into place.
1 July 2008
CROSS Safety Report
Report ID: 110
Region: CROSS-UK