Safety information search results
Filter your results
Building or structure type
Materials
Products
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (5)
- Assessment project [sub-heading only] (2)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (22)
- Extension project (2)
- New build (6)
- Refurbishment (4)
- (-) Remediation project (23)
- Repair project (4)
- Strengthening project (1)
- Structural assessment (4)
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Content type
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (11)
- CROSS-US Newsletter 2 (1)
- CROSS Newsletter (8)
- CROSS Safety Report (23)
- News [sub-heading only] (3)
CROSS regions
Parapet wall collapse
The sudden failure of parapet coping stones on an old two storey industrial building caused the stones to fall onto a road and pavement below.
1 January 2018
CROSS Safety Report
Report ID: 711
Region: CROSS-UK
Dangerously defective glass smoke screens
A reporter was asked to investigate the spontaneous failure of glass smoke control screens at a major retail store.
1 July 2018
CROSS Safety Report
Report ID: 734
Region: CROSS-UK
Dangerous glass infill panels on balustrade
A reporter has expressed their concern about the structural stability of cantilever glass infill panels between a steel post and handrail balustrade system at a high-level apartment block.
1 January 2019
CROSS Safety Report
Report ID: 741
Region: CROSS-UK
Add-on timber trussed roof to flat roof causes failure
A reporter discusses how, while visiting a property for an unrelated matter, they spotted something odd about the roof; the gable had bulged at one end and movement had clearly occurred.
1 October 2018
CROSS Safety Report
Report ID: 742
Region: CROSS-UK
Quality of design and construction of a major bridge structure
This report concerns the design and installation of the bridge bearing zones on a new prestressed precast concrete viaduct.
1 October 2018
CROSS Safety Report
Report ID: 781
Region: CROSS-UK
Inadequate brick ties in gable walls
A reporter was called to council houses at four different sites, whose upper triangle of cavity wall brickwork on the gable end had fallen out, due to not being tied into the roof.
1 July 2019
CROSS Safety Report
Report ID: 785
Region: CROSS-UK
No structural design for steel portal frame building
A reporter is concerned that, in some cases, no structural design is carried out for steel portal framed buildings.
1 January 2020
CROSS Safety Report
Report ID: 866
Region: CROSS-UK
Reinforced autoclaved aerated concrete roof planks - sharing experiences
A reporter has surveyed a number of buildings with reinforced autoclaved aerated concrete (RAAC) roof planks and wants to share their experiences to help others.
1 April 2020
CROSS Safety Report
Report ID: 874
Region: CROSS-UK, CROSS-AUS, CROSS-US
Rotting of cross-laminated timber (CLT) roof panels
This report highlights how a reporter discovered rotted CLT roof panels during the investigation of a roof that had been leaking for a few years.
1 October 2019
CROSS Safety Report
Report ID: 852
Region: CROSS-UK
Unconservative design of flat slab due to software modelling issues
A reporter discusses how a design/modelling problem caused an under-designed reinforced concrete (RC) slab to be constructed.
1 April 2020
CROSS Safety Report
Report ID: 886
Region: CROSS-UK