Safety information search results
Filter your results
Building or structure type
- Bridges (62)
- Buildings
(476)
- Agricultural buildings (9)
- Commercial (41)
- Consequence Class 3 buildings (3)
- Education, science & art buildings (35)
- Health care (14)
- Higher-risk buildings (7)
- Industrial buildings (19)
- Laboratory buildings (1)
- LPS buildings (4)
- Nuclear & energy buildings (2)
- Public, religious & civic buildings (14)
- Recreational buildings (8)
- Residential (143)
- Stadiums (5)
- Storage buildings (9)
- Tall buildings (22)
- Theatres & other entertainment buildings (9)
- Transport buildings (6)
- Buried pipes & culverts (6)
- Car parks (18)
- Flats & apartments (64)
- Floating structures (1)
- Freestanding walls (5)
- Hotels & hostels (13)
- Houses (55)
- Marine structures (2)
- Masts & towers (17)
- Offshore structures (2)
- Railways (18)
- Reservoirs & dams (2)
- Retaining structures (41)
- Roads (14)
- Sewers (4)
- Temporary structures (43)
- Tunnels (4)
Materials
Project or lifecycle stage
Design
- BIM (5)
- Computational design (12)
- Design: quality management (67)
- Design calculations (72)
- Design conceptualisation (26)
- Design detailing (97)
- Design drawings (29)
- Design loads (107)
- Design software (30)
- Dynamics (9)
- Fire safety design (19)
- Resilience (23)
- Robustness (61)
- Structural design (132)
- Sustainability (9)
Fire incident response
Project type
- Alteration & conversion project (41)
- Assessment project [sub-heading only] (21)
- Conservation & restoration project (3)
- Construction project [sub-heading only] (243)
- Demolition project (16)
- Excavation (16)
- Extension project (21)
- Fire safety assessment (2)
- Groundworks project (3)
- Maintenance project (2)
- New build (106)
- Refurbishment (19)
- Remediation project (22)
- Repair project (10)
- Strengthening project (9)
- Structural assessment (30)
- Underpinning project (4)
Construction period
Elements & systems
- Arch (8)
- Balconies (17)
- Balustrades (24)
- Basements (13)
- Beams (81)
- Bracing (23)
- Cables (4)
- Canopies (7)
- Ceilings (25)
- Cladding (39)
- Columns (44)
- Fasteners & connections (166)
- Fences (1)
- Fire exit doors (2)
- Fire protection (17)
- Foundations (38)
- Insulation (10)
- Light gauge steel framing (6)
- Lintels (4)
- Padstones (5)
- Parapets (10)
- PV panels (3)
- Roofs (71)
- Sandwich panels (2)
- Shear walls (3)
- Signs (4)
- Slabs (54)
- Tendons (2)
- Trusses (8)
- Wall head restraints (3)
- Walls (108)
- Wall ties (14)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Organisations
- CROSS-UK [sub-heading only]
(55)
- Building Control Northern Ireland (3)
- Building Safety Regulator (BSR) (1)
- Environment Agency (2)
- Fire and Rescue Service (FRS) (3)
- Health and Safety Executive (HSE) (19)
- Local Authority Building Control (LABC) (24)
- Local Authority Building Standards Scotland (LABSS) (3)
- Scottish Environment Protection Agency (SEPA) (1)
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 1 (16)
- CROSS-UK Newsletter 2 (10)
- CROSS-UK Newsletter 3 (4)
- CROSS-UK Newsletter 4 (8)
- CROSS-UK Newsletter 5 (7)
- CROSS-UK Newsletter 6 (7)
- CROSS-UK Newsletter 7 (5)
- CROSS-UK Newsletter 8 (6)
- CROSS-UK Newsletter 9 (6)
- CROSS-UK Newsletter 10 (7)
- CROSS-UK Newsletter 11 (5)
- CROSS-UK Newsletter 12 (8)
- CROSS-UK Newsletter 13 (6)
- CROSS-UK Newsletter 14 (5)
- CROSS-UK Newsletter 15 (6)
- CROSS-UK Newsletter 16 (6)
- CROSS-UK Newsletter 17 (6)
- CROSS-UK Newsletter 18 (5)
- CROSS-UK Newsletter 19 (6)
- CROSS-UK Newsletter 20 (6)
- CROSS-UK Newsletter 21 (5)
- CROSS-UK Newsletter 22 (5)
- CROSS-UK Newsletter 23 (8)
- CROSS-UK Newsletter 24 (4)
- CROSS-UK Newsletter 25 (3)
- CROSS-UK Newsletter 26 (5)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (5)
- CROSS-UK Newsletter 29 (6)
- CROSS-UK Newsletter 30 (8)
- CROSS-UK Newsletter 31 (6)
- CROSS-UK Newsletter 32 (8)
- CROSS-UK Newsletter 33 (9)
- CROSS-UK Newsletter 34 (7)
- CROSS-UK Newsletter 35 (8)
- CROSS-UK Newsletter 36 (8)
- CROSS-UK Newsletter 37 (8)
- CROSS-UK Newsletter 38 (8)
- CROSS-UK Newsletter 39 (8)
- CROSS-UK Newsletter 40 (7)
- CROSS-UK Newsletter 41 (7)
- CROSS-UK Newsletter 42 (10)
- CROSS-UK Newsletter 43 (7)
- CROSS-UK Newsletter 44 (7)
- CROSS-UK Newsletter 45 (7)
- CROSS-UK Newsletter 46 (7)
- CROSS-UK Newsletter 47 (8)
- CROSS-UK Newsletter 48 (7)
- CROSS-UK Newsletter 49 (8)
- CROSS-UK Newsletter 50 (8)
- CROSS-UK Newsletter 51 (9)
- CROSS-UK Newsletter 52 (8)
- CROSS-UK Newsletter 53 (6)
- CROSS-UK Newsletter 54 (9)
- CROSS-UK Newsletter 55 (7)
- CROSS-UK Newsletter 56 (7)
- CROSS-UK Newsletter 57 (7)
- CROSS-UK Newsletter 58 (9)
- CROSS-UK Newsletter 59 (7)
- CROSS-UK Newsletter 60 (7)
- CROSS-UK Newsletter 61 (4)
- CROSS-UK Newsletter 62 (10)
- CROSS-UK Newsletter 64 (9)
- CROSS-UK Newsletter 65 (10)
- CROSS-UK Newsletter 67 (10)
- CROSS-UK Newsletter 68 (10)
- CROSS-UK [sub-heading only] (390)
- CROSS Feature Article (1)
- CROSS Newsletter (235)
- CROSS Review (21)
- CROSS Safety Alert (30)
- CROSS Safety Report (707)
- CROSS Theme Page (2)
- CROSS Topic Paper (24)
- News [sub-heading only] (75)
- Safety information from CROSS [sub-heading only] (3)
- Safety information [sub-heading only] (1)
- Third party article (1)
- Third party content (11)
- Third party content (5)
- Third party report (1)
CROSS regions
Collapse of old drainage chamber under railway track
Concerns were raised after a hole appeared under a railway track.
1 July 2016
CROSS Safety Report
Report ID: 554
Region: CROSS-UK
Railway tunnel ice strike
A train struck a block of ice, thought at first to have fallen from a tunnel.
1 July 2016
CROSS Safety Report
Report ID: 552
Region: CROSS-UK
Further report on freezing of water in hollow sections
A reporter has a further warning on the issue of freeze/thaw cracking following report 434 after their firm encountered a similar problem on a UK project and investigated the matter.
1 January 2017
CROSS Safety Report
Report ID: 579
Region: CROSS-UK
Alteration of calculations on constructed loft conversion
A reporter says they were pressurised to adjust structural design calculations to pass a building control check.
1 July 2016
CROSS Safety Report
Report ID: 580
Region: CROSS-UK
Ensuring CDM safety files are transferred after change of ownership
Concerns are raised that there is no effective system in place to ensure CDM safety files are passed on to new owners when properties change hands.
1 January 2017
CROSS Safety Report
Report ID: 581
Region: CROSS-UK
Sudden hole in piling mat - update
This is further information about report 566 which highlighted how a sudden hole appeared in a piling mat.
1 October 2016
CROSS Safety Report
Report ID: 596
Region: CROSS-UK
Inadequate structural design of school extension
On review of a design for a school extension, a reporter noted several major issues including an almost total lack of vertical bracing throughout the extension.
1 October 2016
CROSS Safety Report
Report ID: 597
Region: CROSS-UK
Square Hollow Section (SHS) expansion due to freezing
A reporter has come across problems in British Columbia (temp range -30 degrees to +40 degrees) of cracking to square hollow sections (SHS) due to the ingress of water and freezing.
1 April 2017
CROSS Safety Report
Report ID: 641
Region: CROSS-UK
Toppling of precast concrete unit during lifting causes serious injury
During a routine lifting exercise of a precast concrete unit, the unit tipped over while a worker was unslinging the top sling points for the unit using a ladder, causing them a serious injury.
1 April 2017
CROSS Safety Report
Report ID: 642
Region: CROSS-UK
Inadequate end bearings for transfer beams
Whilst advising a steel fabricator on tendering for a transfer structure steel frame, a reporter's firm noticed a serious design error with the bearing pressures at the supports of a transfer beam.
1 October 2017
CROSS Safety Report
Report ID: 644
Region: CROSS-UK