Freezing splits galvanised SHS columns
Concerns were raised after several square hollow section members split vertically on a partially complete construction site.
1 April 2012
CROSS Safety Report
Report ID: 253
Region: CROSS-UK
Pre-stressing ducts
A reporter has come across a situation where during grouting of the ducts in a slab, patches of concrete as big as 0.5m x 1m and 30mm thick fell on to the ground creating a safety hazard.
1 October 2008
CROSS Safety Report
Report ID: 89
Region: CROSS-UK
Car park staircase collapse at construction joint
The top flight of a staircase to a multi-storey concrete car park collapsed approximately 10 years after construction.
1 July 2008
CROSS Safety Report
Report ID: 106
Region: CROSS-UK
Precast concrete planks - durability and potential safety concerns
A reporter raises concerns over the recent collapses of precast concrete floor units that are installed throughout the UK.
1 April 2007
CROSS Safety Report
Report ID: 77
Region: CROSS-UK
Latent shear stud defects
Shear studs appeared to be satisfactory when checked with the standard pull-over to five degrees but when hit with a hammer they snapped off.
1 November 2005
CROSS Safety Report
Report ID: 13
Region: CROSS-UK
Failure of cantilevered stone staircase
During the renovation and change-of-use conversion of a former minor stately home built around 1830, under pedestrian loading, a ‘cantilevered’ stone staircase partially collapsed without warning.
21 February 2023
CROSS Safety Report
Report ID: 1147
Region: CROSS-UK
Another example of brick slips falling from height
Another example of defective brick slips falling from the facade of a building.
10 March 2022
CROSS Safety Report
Report ID: 1081
Region: CROSS-UK
Further report on freezing of water in hollow sections
A reporter has a further warning on the issue of freeze/thaw cracking following report 434 after their firm encountered a similar problem on a UK project and investigated the matter.
1 January 2017
CROSS Safety Report
Report ID: 579
Region: CROSS-UK
Further issues with freezing and galvanised hollow sections
A reporter was involved in correcting a cold formed galvanised square hollow section (SHS) four storey balcony structure where longitudinal splits formed in at least two of the four columns.
1 January 2014
CROSS Safety Report
Report ID: 314
Region: CROSS-UK
Freeze and thaw of another RHS
Further to reports about the freezing of water in hollow sections a correspondent has sent photos of a section of mild steel RHS that was removed from a bridge and shows the bulging that can occur.
1 January 2015
CROSS Safety Report
Report ID: 485
Region: CROSS-UK