Safety information search results
Filter your results
Building or structure type
Materials
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Method of construction
Structural form
Elements & systems
- Balustrades (1)
- Beams (11)
- Bracing (4)
- Cables (1)
- Ceilings (13)
- Cladding (15)
- Columns (6)
- (-) Fasteners & connections (86)
- Fire protection (1)
- Foundations (10)
- Insulation (1)
- Parapets (1)
- Roofs (4)
- Sandwich panels (1)
- Shear walls (2)
- Signs (1)
- Trusses (2)
- Wall head restraints (1)
- Walls (6)
- Wall ties (3)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 1 (2)
- CROSS-UK Newsletter 2 (4)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 6 (2)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 10 (4)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 22 (1)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (2)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (3)
- CROSS-UK Newsletter 39 (2)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 48 (4)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (47)
- CROSS-US Newsletter 2 (2)
- CROSS-US Newsletter 3 (1)
- CROSS-US [sub-heading only] (2)
- CROSS Newsletter (25)
- CROSS Safety Report (86)
- News [sub-heading only] (12)
CROSS regions
Wind damage to secondary elements
A period of storm force winds, with wind speeds approaching design levels, resulted in damage to secondary roofing and cladding elements.
1 July 2006
CROSS Safety Report
Report ID: 42
Region: CROSS-UK
Collapse of tank falsework
This report relates to the collapse of falsework erected to construct an in situ, reinforced concrete, circular water retaining structure.
1 October 2009
CROSS Safety Report
Report ID: 150
Region: CROSS-UK
Dangerous modification to a column
A reporter was requested to visit a warehouse to inspect work carried out to a main support column that had been modified by a builder.
1 July 2010
CROSS Safety Report
Report ID: 169
Region: CROSS-UK
Fall of bridge deck support due to bolt over-tightening
A 7t steel frame designed to temporarily support part of a bridge deck during bearing refurbishments work fell from height as it was about to be lowered some 21m to the ground.
1 January 2011
CROSS Safety Report
Report ID: 216
Region: CROSS-UK
Failure of epoxy fixings due to high temperature
Two mobile phone towers erected on the roofs of nearby buildings collapsed when the epoxy anchors pulled out of the drilled holes.
1 October 2011
CROSS Safety Report
Report ID: 244
Region: CROSS-UK
Defective imported scaffold ties
On a contract where multi lift access scaffolds had been installed for a period of up to 18 months in an exposed coastal location, it was found by a reporter on one of the regular inspections that some of the scaffold ties had failed.
1 April 2011
CROSS Safety Report
Report ID: 230
Region: CROSS-UK
Litigation on divided responsibilities
Divided design responsibilities, says a reporter, are a common source of litigation.
1 January 2013
CROSS Safety Report
Report ID: 229
Region: CROSS-UK
Collapse of recently installed suspended ceiling
Bingo players had a narrow escape when the ceiling of the hall in which they were playing collapsed.
1 July 2011
CROSS Safety Report
Report ID: 203
Region: CROSS-UK
Partial collapse of suspended ceiling
A section of suspended ceiling in a multi-storey building collapsed.
1 January 2014
CROSS Safety Report
Report ID: 304
Region: CROSS-UK
Documentation for imported large diameter steel pins
A reporter raises concerns over the possibility that foreign steel with poor, confusing or misleading documentation, is being used on safety critical structures in the UK.
1 January 2013
CROSS Safety Report
Report ID: 299
Region: CROSS-UK