Safety information search results
Filter your results
Building or structure type
- Bridges (18)
- Buildings
(93)
- Car parks (9)
- Commercial (4)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (3)
- Health care (1)
- Higher-risk buildings (1)
- Industrial buildings (1)
- Laboratory buildings (1)
- LPS buildings (4)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (1)
- Recreational buildings (2)
- Residential (23)
- Stadiums (1)
- Storage buildings (2)
- Tall buildings (5)
- Theatres & other entertainment buildings (1)
- Transport buildings (1)
- Buried pipes & culverts (2)
- Masts & towers (2)
- Railways (6)
- Retaining structures (11)
- Roads (5)
- Sewers (2)
- Temporary structures (4)
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (5)
- Assessment project [sub-heading only] (8)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (76)
- Demolition project (8)
- Excavation (1)
- Extension project (3)
- Fire safety assessment (1)
- Groundworks project (1)
- New build (54)
- Refurbishment (3)
- Remediation project (5)
- Repair project (3)
- Strengthening project (4)
- Structural assessment (10)
- Underpinning project (1)
Elements & systems
- Balconies (4)
- Balustrades (1)
- Basements (4)
- Beams (27)
- Bracing (4)
- Canopies (1)
- Ceilings (3)
- Cladding (2)
- Columns (20)
- Fasteners & connections (28)
- Fire protection (3)
- Foundations (14)
- Insulation (2)
- Light gauge steel framing (1)
- Lintels (1)
- Padstones (2)
- Parapets (5)
- Roofs (8)
- Shear walls (1)
- Signs (2)
- Slabs (44)
- Tendons (1)
- Wall head restraints (1)
- Walls (25)
- Wall ties (1)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Locations
Content type
- CROSS-UK Newsletter 2 (4)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 9 (3)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (2)
- CROSS-UK Newsletter 12 (2)
- CROSS-UK Newsletter 13 (1)
- CROSS-UK Newsletter 15 (2)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 18 (4)
- CROSS-UK Newsletter 19 (3)
- CROSS-UK Newsletter 20 (2)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 26 (4)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 30 (4)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 34 (3)
- CROSS-UK Newsletter 35 (3)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (3)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (3)
- CROSS-UK Newsletter 47 (4)
- CROSS-UK Newsletter 48 (3)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 51 (2)
- CROSS-UK Newsletter 52 (4)
- CROSS-UK Newsletter 54 (4)
- CROSS-UK Newsletter 55 (3)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (7)
- CROSS-UK Newsletter 59 (3)
- CROSS-UK Newsletter 60 (3)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 64 (2)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (90)
- CROSS Newsletter (57)
- CROSS Safety Alert (3)
- CROSS Safety Report (146)
- CROSS Theme Page (1)
- News [sub-heading only] (13)
- Third party article (1)
- Third party content (1)
CROSS regions
CARES Alert: Unregulated reinforcement continuity systems
CARES is investigating unregulated reinforcement continuity systems entering the construction supply chain.
27 April 2021
Third party content
Publisher: CARES
Precast concrete panel fixing
A 1960s flyover was being demolished and an interesting feature came to light how the precast concrete edge panels were fixed.
30 June 2022
CROSS Safety Report
Report ID: 965
Region: CROSS-UK
Problem when launching a prestressed beam
When lowered onto its elastomeric bearings, a 40m span post-tensioned ‘I’ beam started to move towards the outer edge of the pier cap.
30 July 2021
CROSS Safety Report
Report ID: 1027
Region: CROSS-UK
Preparation of holes in concrete for chemical anchors
Reinforcement intended to be resin anchored into concrete was not anchored, because the resin did not cure, due to contamination within the holes.
6 June 2022
CROSS Safety Report
Report ID: 1096
Region: CROSS-UK
Floor vibration in a gym
Vibration within the floor structure of a second floor gym gives rise to concern of structural resonance and possible fatigue of structural members.
26 August 2022
CROSS Safety Report
Report ID: 1106
Region: CROSS-UK
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Structural corrosion in a swimming pool building causes concern
A survey showed severe corrosion of previously repaired steelwork columns adjacent to a public swimming pool.
30 July 2021
CROSS Safety Report
Report ID: 1004
Region: CROSS-UK
Overloading of existing steelwork frame
Inadequate structural investigations and design of alteration works leads to damage to multi-storey flats.
10 March 2022
CROSS Safety Report
Report ID: 1033
Region: CROSS-UK
Reinforced aerated autoclaved concrete planks found on pitched roof of 1990s hospital building
A building constructed in the early 1990s has been found to contain reinforced aerated autoclaved concrete (RAAC) planks. This date is important since it is much later than the previously thought last significant use of RAAC in buildings in the UK and potentially affects the scope of buildings that could require screening for RAAC problems.
26 August 2022
CROSS Safety Report
Report ID: 1125
Region: CROSS-UK
Misleading instructions for a structural component
A reporter confirms the difficulty encountered whilst endeavouring to ensure cast-in insulated connectors supporting a parapet wall and balustrade were properly fixed.
26 August 2022
CROSS Safety Report
Report ID: 1127
Region: CROSS-UK