Safety information search results
Filter your results
Building or structure type
- Bridges (65)
- Buildings
(514)
- Agricultural buildings (9)
- Commercial (49)
- Consequence Class 3 buildings (3)
- Education, science & art buildings (38)
- Health care (16)
- Higher-risk buildings (7)
- Industrial buildings (23)
- Laboratory buildings (1)
- LPS buildings (4)
- Nuclear & energy buildings (2)
- Public, religious & civic buildings (14)
- Recreational buildings (9)
- Residential (151)
- Stadiums (6)
- Storage buildings (11)
- Tall buildings (24)
- Theatres & other entertainment buildings (11)
- Transport buildings (6)
- Buried pipes & culverts (7)
- Car parks (18)
- Flats & apartments (64)
- Floating structures (1)
- Freestanding walls (5)
- Hotels & hostels (13)
- Houses (55)
- Marine structures (3)
- Masts & towers (19)
- Offshore structures (2)
- Railways (18)
- Reservoirs & dams (2)
- Retaining structures (41)
- Roads (14)
- Sewers (5)
- Temporary structures (44)
- Tunnels (4)
Building height
Materials
Project or lifecycle stage
Design
- BIM (6)
- Computational design (14)
- Design: quality management (72)
- Design calculations (81)
- Design conceptualisation (30)
- Design detailing (113)
- Design drawings (37)
- Design loads (117)
- Design software (34)
- Dynamics (12)
- Fire safety design (22)
- Resilience (24)
- Robustness (62)
- Structural design (147)
- Sustainability (9)
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (43)
- Assessment project [sub-heading only] (21)
- Conservation & restoration project (3)
- Construction project [sub-heading only] (263)
- Demolition project (16)
- Excavation (17)
- Extension project (21)
- Fire safety assessment (2)
- Groundworks project (3)
- Maintenance project (5)
- New build (119)
- Refurbishment (21)
- Remediation project (23)
- Repair project (10)
- Strengthening project (11)
- Structural assessment (30)
- Underpinning project (4)
Construction period
Elements & systems
- Arch (8)
- Balconies (17)
- Balustrades (25)
- Basements (13)
- Beams (86)
- Bracing (23)
- Cables (4)
- Canopies (8)
- Ceilings (26)
- Cladding (41)
- Columns (50)
- Fasteners & connections (177)
- Fences (1)
- Fire exit doors (2)
- Fire protection (17)
- Foundations (44)
- Insulation (10)
- Light gauge steel framing (11)
- Lintels (4)
- Padstones (5)
- Parapets (12)
- PV panels (4)
- Roofs (81)
- Sandwich panels (3)
- Shear walls (5)
- Signs (5)
- Slabs (60)
- Tendons (2)
- Trusses (11)
- Wall head restraints (3)
- Walls (116)
- Wall ties (14)
- Wind posts (1)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
- CROSS-AUS [sub-heading only] (13)
- CROSS-UK [sub-heading only]
(55)
- Building Control Northern Ireland (3)
- Building Safety Regulator (BSR) (1)
- Environment Agency (2)
- Fire and Rescue Service (FRS) (3)
- Health and Safety Executive (HSE) (19)
- Local Authority Building Control (LABC) (24)
- Local Authority Building Standards Scotland (LABSS) (3)
- Scottish Environment Protection Agency (SEPA) (1)
- CROSS-US [sub-heading only] (1)
Business practice
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS Newsletter 2 (6)
- CROSS-AUS Newsletter 3 (6)
- CROSS-AUS Newsletter 4 (6)
- CROSS-AUS Newsletter 5 (4)
- CROSS-AUS Newsletter 8 (2)
- CROSS-AUS [sub-heading only] (19)
- CROSS-UK Newsletter 1 (16)
- CROSS-UK Newsletter 2 (10)
- CROSS-UK Newsletter 3 (4)
- CROSS-UK Newsletter 4 (9)
- CROSS-UK Newsletter 5 (7)
- CROSS-UK Newsletter 6 (7)
- CROSS-UK Newsletter 7 (5)
- CROSS-UK Newsletter 8 (6)
- CROSS-UK Newsletter 9 (6)
- CROSS-UK Newsletter 10 (7)
- CROSS-UK Newsletter 11 (5)
- CROSS-UK Newsletter 12 (8)
- CROSS-UK Newsletter 13 (6)
- CROSS-UK Newsletter 14 (5)
- CROSS-UK Newsletter 15 (6)
- CROSS-UK Newsletter 16 (6)
- CROSS-UK Newsletter 17 (6)
- CROSS-UK Newsletter 18 (5)
- CROSS-UK Newsletter 19 (6)
- CROSS-UK Newsletter 20 (6)
- CROSS-UK Newsletter 21 (5)
- CROSS-UK Newsletter 22 (5)
- CROSS-UK Newsletter 23 (8)
- CROSS-UK Newsletter 24 (4)
- CROSS-UK Newsletter 25 (3)
- CROSS-UK Newsletter 26 (5)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (5)
- CROSS-UK Newsletter 29 (6)
- CROSS-UK Newsletter 30 (8)
- CROSS-UK Newsletter 31 (6)
- CROSS-UK Newsletter 32 (8)
- CROSS-UK Newsletter 33 (9)
- CROSS-UK Newsletter 34 (7)
- CROSS-UK Newsletter 35 (8)
- CROSS-UK Newsletter 36 (8)
- CROSS-UK Newsletter 37 (8)
- CROSS-UK Newsletter 38 (8)
- CROSS-UK Newsletter 39 (8)
- CROSS-UK Newsletter 40 (7)
- CROSS-UK Newsletter 41 (7)
- CROSS-UK Newsletter 42 (10)
- CROSS-UK Newsletter 43 (7)
- CROSS-UK Newsletter 44 (7)
- CROSS-UK Newsletter 45 (7)
- CROSS-UK Newsletter 46 (7)
- CROSS-UK Newsletter 47 (8)
- CROSS-UK Newsletter 48 (7)
- CROSS-UK Newsletter 49 (8)
- CROSS-UK Newsletter 50 (8)
- CROSS-UK Newsletter 51 (9)
- CROSS-UK Newsletter 52 (8)
- CROSS-UK Newsletter 53 (6)
- CROSS-UK Newsletter 54 (9)
- CROSS-UK Newsletter 55 (7)
- CROSS-UK Newsletter 56 (7)
- CROSS-UK Newsletter 57 (7)
- CROSS-UK Newsletter 58 (9)
- CROSS-UK Newsletter 59 (7)
- CROSS-UK Newsletter 60 (7)
- CROSS-UK Newsletter 61 (4)
- CROSS-UK Newsletter 62 (10)
- CROSS-UK Newsletter 64 (9)
- CROSS-UK Newsletter 65 (10)
- CROSS-UK Newsletter 67 (10)
- CROSS-UK Newsletter 68 (10)
- CROSS-UK [sub-heading only] (391)
- CROSS-US Newsletter 1 (5)
- CROSS-US Newsletter 2 (6)
- CROSS-US Newsletter 3 (5)
- CROSS-US [sub-heading only] (10)
- CROSS Feature Article (1)
- CROSS Newsletter (235)
- CROSS Review (21)
- CROSS Safety Alert (30)
- CROSS Safety Report (768)
- CROSS Theme Page (2)
- CROSS Topic Paper (24)
- News [sub-heading only] (75)
- Safety information from CROSS [sub-heading only] (4)
- Safety information [sub-heading only] (5)
- Third party article (1)
- Third party content (11)
- Third party content (5)
- Third party report (1)
CROSS regions
Risk of fire spread through service ducts
A reporter highlights that the risk of spread of smoke, hot gases and flames due to deficiencies in service ducts is an important subject that needs detailed investigation.
1 January 2018
CROSS Safety Report
Report ID: 707
Region: CROSS-UK
Who takes responsibility for preventing a failure?
After reading the safety alert on Hazard identification for structural design, a reporter shares their views how various parties involved with structural safety sometimes see their responsibilities.
1 July 2018
CROSS Safety Report
Report ID: 704
Region: CROSS-UK
Scaffold lifting beams incorrectly installed
During the inspection of scaffolding prior to loading, it was observed that there were lifting beams with end stops and ultimate stop cross bolts incorrectly installed.
1 January 2018
CROSS Safety Report
Report ID: 702
Region: CROSS-UK
Unsafe removal of internal walls
A reporter was requested to advise on the removal of some internal walls in a decades’ old multi storey block of council flats after they were removed.
1 October 2018
CROSS Safety Report
Report ID: 714
Region: CROSS-UK
No responsibility for damaged footbridge
A reporter describes how they tried to raise concerns over a damaged footbridge but could not determine who ownership.
1 July 2018
CROSS Safety Report
Report ID: 723
Region: CROSS-UK
The role of District Surveyors
A reporter highlights how, under the London Building Acts 1930, District Surveyors were appointed to supervise construction and enforce regulations.
1 January 2018
CROSS Safety Report
Report ID: 713
Region: CROSS-UK
Incorrect scaffold installation
A reporter describes how the Temporary Works Coordinator observed that tension connections on standards for a scaffold system were either omitted or had incorrect pins/bolts used.
1 January 2018
CROSS Safety Report
Report ID: 700
Region: CROSS-UK
Inadequate design of cantilever glass barriers
A reporter has observed a growing number of cases where cantilever glass balustrades in public buildings are, in their view, inadequately designed.
1 April 2018
CROSS Safety Report
Report ID: 735
Region: CROSS-UK
Building extension causes snow drifting failure
The reporter feels that structural engineers are failing to realise the implications of creating a valley or an upstand and the potential for snow drift to occur.
1 April 2018
CROSS Safety Report
Report ID: 736
Region: CROSS-UK
Common use of S235 cold rolled steel instead of S355 hot rolled steel
It has come to a reporter's attention that some local fabricators are purchasing S235 cold rolled hollow sections rather than the specified S355 hot rolled sections, as they are easier and cheaper to obtain.
1 April 2018
CROSS Safety Report
Report ID: 740
Region: CROSS-UK