Safety information search results
Filter your results
Building or structure type
- Bridges (65)
- Buildings
(514)
- Agricultural buildings (9)
- Commercial (49)
- Consequence Class 3 buildings (3)
- Education, science & art buildings (38)
- Health care (16)
- Higher-risk buildings (7)
- Industrial buildings (23)
- Laboratory buildings (1)
- LPS buildings (4)
- Nuclear & energy buildings (2)
- Public, religious & civic buildings (14)
- Recreational buildings (9)
- Residential (151)
- Stadiums (6)
- Storage buildings (11)
- Tall buildings (24)
- Theatres & other entertainment buildings (11)
- Transport buildings (6)
- Buried pipes & culverts (7)
- Car parks (18)
- Flats & apartments (64)
- Floating structures (1)
- Freestanding walls (5)
- Hotels & hostels (13)
- Houses (55)
- Marine structures (3)
- Masts & towers (19)
- Offshore structures (2)
- Railways (18)
- Reservoirs & dams (2)
- Retaining structures (41)
- Roads (14)
- Sewers (5)
- Temporary structures (44)
- Tunnels (4)
Building height
Materials
Project or lifecycle stage
Design
- BIM (6)
- Computational design (14)
- Design: quality management (72)
- Design calculations (81)
- Design conceptualisation (30)
- Design detailing (113)
- Design drawings (37)
- Design loads (117)
- Design software (34)
- Dynamics (12)
- Fire safety design (22)
- Resilience (24)
- Robustness (62)
- Structural design (147)
- Sustainability (9)
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (43)
- Assessment project [sub-heading only] (21)
- Conservation & restoration project (3)
- Construction project [sub-heading only] (263)
- Demolition project (16)
- Excavation (17)
- Extension project (21)
- Fire safety assessment (2)
- Groundworks project (3)
- Maintenance project (5)
- New build (119)
- Refurbishment (21)
- Remediation project (23)
- Repair project (10)
- Strengthening project (11)
- Structural assessment (30)
- Underpinning project (4)
Construction period
Elements & systems
- Arch (8)
- Balconies (17)
- Balustrades (25)
- Basements (13)
- Beams (86)
- Bracing (23)
- Cables (4)
- Canopies (8)
- Ceilings (26)
- Cladding (41)
- Columns (50)
- Fasteners & connections (177)
- Fences (1)
- Fire exit doors (2)
- Fire protection (17)
- Foundations (44)
- Insulation (10)
- Light gauge steel framing (11)
- Lintels (4)
- Padstones (5)
- Parapets (12)
- PV panels (4)
- Roofs (81)
- Sandwich panels (3)
- Shear walls (5)
- Signs (5)
- Slabs (60)
- Tendons (2)
- Trusses (11)
- Wall head restraints (3)
- Walls (116)
- Wall ties (14)
- Wind posts (1)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
- CROSS-AUS [sub-heading only] (13)
- CROSS-UK [sub-heading only]
(55)
- Building Control Northern Ireland (3)
- Building Safety Regulator (BSR) (1)
- Environment Agency (2)
- Fire and Rescue Service (FRS) (3)
- Health and Safety Executive (HSE) (19)
- Local Authority Building Control (LABC) (24)
- Local Authority Building Standards Scotland (LABSS) (3)
- Scottish Environment Protection Agency (SEPA) (1)
- CROSS-US [sub-heading only] (1)
Business practice
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS Newsletter 2 (6)
- CROSS-AUS Newsletter 3 (6)
- CROSS-AUS Newsletter 4 (6)
- CROSS-AUS Newsletter 5 (4)
- CROSS-AUS Newsletter 8 (2)
- CROSS-AUS [sub-heading only] (19)
- CROSS-UK Newsletter 1 (16)
- CROSS-UK Newsletter 2 (10)
- CROSS-UK Newsletter 3 (4)
- CROSS-UK Newsletter 4 (9)
- CROSS-UK Newsletter 5 (7)
- CROSS-UK Newsletter 6 (7)
- CROSS-UK Newsletter 7 (5)
- CROSS-UK Newsletter 8 (6)
- CROSS-UK Newsletter 9 (6)
- CROSS-UK Newsletter 10 (7)
- CROSS-UK Newsletter 11 (5)
- CROSS-UK Newsletter 12 (8)
- CROSS-UK Newsletter 13 (6)
- CROSS-UK Newsletter 14 (5)
- CROSS-UK Newsletter 15 (6)
- CROSS-UK Newsletter 16 (6)
- CROSS-UK Newsletter 17 (6)
- CROSS-UK Newsletter 18 (5)
- CROSS-UK Newsletter 19 (6)
- CROSS-UK Newsletter 20 (6)
- CROSS-UK Newsletter 21 (5)
- CROSS-UK Newsletter 22 (5)
- CROSS-UK Newsletter 23 (8)
- CROSS-UK Newsletter 24 (4)
- CROSS-UK Newsletter 25 (3)
- CROSS-UK Newsletter 26 (5)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (5)
- CROSS-UK Newsletter 29 (6)
- CROSS-UK Newsletter 30 (8)
- CROSS-UK Newsletter 31 (6)
- CROSS-UK Newsletter 32 (8)
- CROSS-UK Newsletter 33 (9)
- CROSS-UK Newsletter 34 (7)
- CROSS-UK Newsletter 35 (8)
- CROSS-UK Newsletter 36 (8)
- CROSS-UK Newsletter 37 (8)
- CROSS-UK Newsletter 38 (8)
- CROSS-UK Newsletter 39 (8)
- CROSS-UK Newsletter 40 (7)
- CROSS-UK Newsletter 41 (7)
- CROSS-UK Newsletter 42 (10)
- CROSS-UK Newsletter 43 (7)
- CROSS-UK Newsletter 44 (7)
- CROSS-UK Newsletter 45 (7)
- CROSS-UK Newsletter 46 (7)
- CROSS-UK Newsletter 47 (8)
- CROSS-UK Newsletter 48 (7)
- CROSS-UK Newsletter 49 (8)
- CROSS-UK Newsletter 50 (8)
- CROSS-UK Newsletter 51 (9)
- CROSS-UK Newsletter 52 (8)
- CROSS-UK Newsletter 53 (6)
- CROSS-UK Newsletter 54 (9)
- CROSS-UK Newsletter 55 (7)
- CROSS-UK Newsletter 56 (7)
- CROSS-UK Newsletter 57 (7)
- CROSS-UK Newsletter 58 (9)
- CROSS-UK Newsletter 59 (7)
- CROSS-UK Newsletter 60 (7)
- CROSS-UK Newsletter 61 (4)
- CROSS-UK Newsletter 62 (10)
- CROSS-UK Newsletter 64 (9)
- CROSS-UK Newsletter 65 (10)
- CROSS-UK Newsletter 67 (10)
- CROSS-UK Newsletter 68 (10)
- CROSS-UK [sub-heading only] (391)
- CROSS-US Newsletter 1 (5)
- CROSS-US Newsletter 2 (6)
- CROSS-US Newsletter 3 (5)
- CROSS-US [sub-heading only] (10)
- CROSS Feature Article (1)
- CROSS Newsletter (235)
- CROSS Review (21)
- CROSS Safety Alert (30)
- CROSS Safety Report (768)
- CROSS Theme Page (2)
- CROSS Topic Paper (24)
- News [sub-heading only] (75)
- Safety information from CROSS [sub-heading only] (4)
- Safety information [sub-heading only] (5)
- Third party article (1)
- Third party content (11)
- Third party content (5)
- Third party report (1)
CROSS regions
Inadequate foundation reinforcement
Subcontractors carrying out the ground works for a multi-storey development failed to provide sufficient continuity reinforcement in the ground beams.
1 October 2008
CROSS Safety Report
Report ID: 112
Region: CROSS-UK
Follow up to Liquid Metal Assisted Cracking (LMAC)
A recent case involving cracking around holes in large structural components was detected immediately after galvanising as a result of the team being aware of the need for post galvanising inspection.
1 July 2008
CROSS Safety Report
Report ID: 105
Region: CROSS-UK
Ceiling collapse in cinema due to fixing failures
A number of fixings of a ceiling support system pulled out setting up a cascade reaction such that the whole ceiling fell down.
1 April 2008
CROSS Safety Report
Report ID: 103
Region: CROSS-UK
Serious injury from free standing wall collapse
A 100mm wide brick masonry wall in a garden collapsed seriously injuring one person.
1 January 2008
CROSS Safety Report
Report ID: 94
Region: CROSS-UK
Proper design and use of cold rolled steel frames
A reporter has been designing structures in cold rolled steel for approximately twenty years, mainly portal frame buildings, and some concerns.
1 January 2008
CROSS Safety Report
Report ID: 93
Region: CROSS-UK
Collapse of a gable wall
Part of a gable wall to a fairly recently constructed block of flats collapsed onto a parked car which suffered significant damage.
1 April 2008
CROSS Safety Report
Report ID: 92
Region: CROSS-UK
Blind bolt query
Further to report 71 regarding ‘blind bolts’ a query was received as to how to include an appropriate clause in a specification for structural works.
1 October 2008
CROSS Safety Report
Report ID: 113
Region: CROSS-UK
Issues for CDM co-ordinators
A reporter feels that a lack of finance is being invested in the long-term maintenance for structures and that this is a difficult issue for the CDM co-ordinator to raise with the client.
1 January 2009
CROSS Safety Report
Report ID: 118
Region: CROSS-UK
Lifting bolt failure
A major contractor reported an incident that had occurred in which a threaded eyebolt failed during an operation to lift a section of stonework into place.
1 July 2008
CROSS Safety Report
Report ID: 110
Region: CROSS-UK
Unauthorised scaffolding
A reporter raises concerns over a temporary scaffold support that they came across that was over a public highway.
1 July 2008
CROSS Safety Report
Report ID: 111
Region: CROSS-UK