Checking at a price
In relation to the checking of calculations on behalf of local authorities for building regulation submissions a reporter is concerned about checking engineers who are paid very low hourly rates.
Failed two storey retaining wall
A two storey high retaining wall adjacent to a house collapsed.
Lack of control on site when underpinning
The concern is in relation to the sequencing of construction and the lack of control on site from competent persons during underpinning works.
Failure of epoxy fixings due to high temperature
Two mobile phone towers erected on the roofs of nearby buildings collapsed when the epoxy anchors pulled out of the drilled holes.
Generic designs for steel beams in domestic buildings
A reporter raises concerns about the production of generic steel beam designs.
Foundation base plates for tower cranes
On two different contracts it was observed that the foundation base plates for tower cranes had suffered from low compaction of the concrete on which they rest.
Asymmetric bridge design and construction – a near miss
During the construction stage of an arch footbridge a design error was identified that had been indirectly revealed by an associated error in construction.
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.
Feedback
No feedback has yet been published for this page.