Safety information search results
Filter your results
Building or structure type
- Bridges (22)
- Buildings
(231)
- Agricultural buildings (8)
- Car parks (7)
- Commercial (19)
- Consequence Class 3 buildings (3)
- Education, science & art buildings (13)
- Higher-risk buildings (3)
- Industrial buildings (9)
- LPS buildings (3)
- Public, religious & civic buildings (6)
- Recreational buildings (3)
- Residential (57)
- Stadiums (1)
- Storage buildings (7)
- Tall buildings (14)
- Theatres & other entertainment buildings (7)
- Transport buildings (1)
- Buried pipes & culverts (3)
- Freestanding walls (2)
- Marine structures (1)
- Masts & towers (9)
- Offshore structures (2)
- Railways (7)
- Reservoirs & dams (1)
- Retaining structures (19)
- Roads (9)
- Sewers (3)
- Temporary structures (24)
- Tunnels (1)
Materials
Project or lifecycle stage
Design
- BIM (2)
- Computational design (2)
- Design: quality management (42)
- Design calculations (45)
- Design conceptualisation (1)
- Design detailing (55)
- Design drawings (14)
- Design loads (67)
- Design software (18)
- Dynamics (6)
- Fire safety design (7)
- Resilience (18)
- Robustness (35)
- Structural design (72)
- Sustainability (4)
Fire incident response
Project type
- Alteration & conversion project (23)
- Assessment project [sub-heading only] (9)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (154)
- Demolition project (11)
- Excavation (12)
- Extension project (11)
- Fire safety assessment (2)
- Groundworks project (1)
- Maintenance project (1)
- New build (70)
- Refurbishment (4)
- Remediation project (11)
- Repair project (5)
- Strengthening project (4)
- Structural assessment (8)
- Underpinning project (3)
Method of construction
Elements & systems
- Arch (5)
- Balconies (9)
- Balustrades (14)
- Basements (7)
- Beams (50)
- Bracing (18)
- Canopies (5)
- Ceilings (19)
- Cladding (17)
- Columns (29)
- Fasteners & connections (96)
- Fire exit doors (1)
- Fire protection (7)
- Foundations (17)
- Insulation (6)
- Light gauge steel framing (2)
- Lintels (3)
- Padstones (3)
- Parapets (7)
- Roofs (37)
- Sandwich panels (1)
- Shear walls (1)
- Signs (3)
- Slabs (28)
- Tendons (1)
- Trusses (4)
- Walls (65)
- Wall ties (7)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Locations
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 1 (14)
- CROSS-UK Newsletter 2 (10)
- CROSS-UK Newsletter 3 (4)
- CROSS-UK Newsletter 4 (9)
- CROSS-UK Newsletter 5 (7)
- CROSS-UK Newsletter 6 (7)
- CROSS-UK Newsletter 7 (5)
- CROSS-UK Newsletter 8 (6)
- CROSS-UK Newsletter 9 (6)
- CROSS-UK Newsletter 10 (7)
- CROSS-UK Newsletter 11 (5)
- CROSS-UK Newsletter 12 (7)
- CROSS-UK Newsletter 13 (5)
- CROSS-UK Newsletter 14 (5)
- CROSS-UK Newsletter 15 (6)
- CROSS-UK Newsletter 16 (6)
- CROSS-UK Newsletter 17 (6)
- CROSS-UK Newsletter 18 (5)
- CROSS-UK Newsletter 19 (6)
- CROSS-UK Newsletter 20 (6)
- CROSS-UK Newsletter 21 (5)
- CROSS-UK Newsletter 22 (5)
- CROSS-UK Newsletter 23 (8)
- CROSS-UK Newsletter 24 (4)
- CROSS-UK Newsletter 25 (3)
- CROSS-UK Newsletter 26 (5)
- CROSS-UK Newsletter 27 (3)
- CROSS-UK Newsletter 28 (5)
- CROSS-UK Newsletter 29 (6)
- CROSS-UK Newsletter 30 (8)
- CROSS-UK Newsletter 31 (6)
- CROSS-UK Newsletter 32 (8)
- CROSS-UK Newsletter 33 (8)
- CROSS-UK Newsletter 34 (7)
- CROSS-UK Newsletter 35 (6)
- CROSS-UK Newsletter 36 (8)
- CROSS-UK Newsletter 37 (8)
- CROSS-UK Newsletter 38 (7)
- CROSS-UK Newsletter 39 (7)
- CROSS-UK Newsletter 40 (7)
- CROSS-UK Newsletter 41 (7)
- CROSS-UK Newsletter 42 (6)
- CROSS-UK Newsletter 43 (6)
- CROSS-UK Newsletter 44 (7)
- CROSS-UK Newsletter 45 (7)
- CROSS-UK Newsletter 46 (6)
- CROSS-UK Newsletter 47 (8)
- CROSS-UK Newsletter 48 (6)
- CROSS-UK Newsletter 49 (8)
- CROSS-UK Newsletter 50 (7)
- CROSS-UK Newsletter 51 (8)
- CROSS-UK Newsletter 52 (8)
- CROSS-UK Newsletter 53 (6)
- CROSS-UK Newsletter 54 (9)
- CROSS-UK Newsletter 55 (6)
- CROSS-UK Newsletter 56 (7)
- CROSS-UK Newsletter 57 (7)
- CROSS-UK Newsletter 58 (7)
- CROSS-UK Newsletter 59 (6)
- CROSS-UK Newsletter 60 (3)
- (-) CROSS-UK [sub-heading only] (391)
- CROSS Newsletter (198)
- CROSS Safety Report (391)
- News [sub-heading only] (73)
CROSS regions
Low pitched metal sheet roofs
A reporter is concerned about low pitch metal sheet roofing attached to trussed rafters.
1 April 2007
CROSS Safety Report
Report ID: 66
Region: CROSS-UK
Local authorities and approved inspectors
A reporter is very concerned that the system of building control where there is competition between local authorities and approved inspectors, has produced a situation where the level of independent inspection has fallen dramatically.
1 July 2007
CROSS Safety Report
Report ID: 67
Region: CROSS-UK
Masonry support prop adaptor
A reporter has written to say that when carrying out temporary needling and propping of openings formed in masonry walls one of the most important aspects is to ensure that the props are concentrically loaded and plumb.
1 July 2006
CROSS Safety Report
Report ID: 32
Region: CROSS-UK
Local authority checking
A reporter feels that many small consulting engineering companies rely on local authority building control departments to check their work in lieu of proper in-house quality control.
1 March 2006
CROSS Safety Report
Report ID: 41
Region: CROSS-UK
Wind damage to secondary elements
A period of storm force winds, with wind speeds approaching design levels, resulted in damage to secondary roofing and cladding elements.
1 July 2006
CROSS Safety Report
Report ID: 42
Region: CROSS-UK
Rendered ceiling failure
This report relates to a failure of a false ceiling below a precast concrete floor.
1 January 2010
CROSS Safety Report
Report ID: 149
Region: CROSS-UK
Collapse of tank falsework
This report relates to the collapse of falsework erected to construct an in situ, reinforced concrete, circular water retaining structure.
1 October 2009
CROSS Safety Report
Report ID: 150
Region: CROSS-UK
Dangerous modification to a column
A reporter was requested to visit a warehouse to inspect work carried out to a main support column that had been modified by a builder.
1 July 2010
CROSS Safety Report
Report ID: 169
Region: CROSS-UK
Blind bolt failure on offshore platform
A reporter describes how there was a failure on an offshore platform of a 20t winch base under load testing.
1 January 2010
CROSS Safety Report
Report ID: 170
Region: CROSS-UK
Concerns on stability require prompt action
A reporter was concerned about overall building stability during an extension and conversion project.
1 January 2010
CROSS Safety Report
Report ID: 171
Region: CROSS-UK