Fatigue failure of bridge cross-girder
During a planned examination of a bridge, a cross-girder was found to have failed via fatigue.
23 May 2022
CROSS Safety Report
Report ID: 743
Region: CROSS-UK
Corrosion of main girder beam on bridge supporting rail lines
A hole was found in the central main girder on a bridge supporting rail line during inspection works.
23 May 2022
CROSS Safety Report
Report ID: 745
Region: CROSS-UK
Corrosion of bridge girder beams
Severe corrosion of bridge girder beams was found during intrusive inspections.
23 May 2022
CROSS Safety Report
Report ID: 772
Region: CROSS-UK
Accelerated corrosion of telecoms mast holding down bolts
During an examination of a 20m high telecoms mast, a reporter found that there had been accelerated corrosion of the galvanised holding down bolts.
1 June 2022
CROSS Safety Report
Report ID: 773
Region: CROSS-UK
Corrosion of steel truss footbridge
Severe corrosion was found in a steel truss footbridge during a planned examination.
23 May 2022
CROSS Safety Report
Report ID: 774
Region: CROSS-UK
Inadequate modelling of existing building
An existing building suffered damage while being upgraded, which led to a more detailed inspection of the existing building’s condition. The report highlights the importance of conducting a thorough investigation and assessment of an existing building structure to ensure an understanding of how it will perform under the applied design loads, rather than relying on assumptions that may be unre...
30 March 2023
CROSS Safety Report
Report ID: 1082
Region: CROSS-AUS
Another example of brick slips falling from height
Another example of defective brick slips falling from the facade of a building.
10 March 2022
CROSS Safety Report
Report ID: 1081
Region: CROSS-UK
Rotting plywood decking on grandstand
During visual structural inspections of temporary demountable grandstands, a walkway board failed when it was walked on.
31 May 2022
CROSS Safety Report
Report ID: 1092
Region: CROSS-UK
Concrete system buildings - need for period inspection
Evidence of corrosion of tendons in post-tensioned components came to light which was associated with exposure of tendons to moisture in voids in ducts and sometimes also the presence of chlorides.
1 December 2001
CROSS Safety Alert
Region: CROSS-UK
Vegetation damage to railway arches
Lack of clarity as to maintenance responsibilities leads to degradation of railway arches.
6 June 2022
CROSS Safety Report
Report ID: 1064
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.