Safety information search results
Filter your results
Building or structure type
- Bridges (24)
- Buildings
(205)
- Car parks (6)
- Commercial (16)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (10)
- Health care (2)
- Industrial buildings (3)
- LPS buildings (1)
- Public, religious & civic buildings (4)
- Recreational buildings (2)
- Residential (54)
- Stadiums (3)
- Storage buildings (3)
- Tall buildings (6)
- Theatres & other entertainment buildings (6)
- Transport buildings (2)
- Buried pipes & culverts (3)
- Masts & towers (12)
- Railways (7)
- Reservoirs & dams (1)
- Retaining structures (19)
- Roads (6)
- Sewers (3)
- Temporary structures (24)
- Tunnels (2)
Materials
Project or lifecycle stage
Design
- BIM (2)
- Computational design (1)
- Design: quality management (21)
- Design calculations (22)
- Design conceptualisation (8)
- Design detailing (56)
- Design drawings (21)
- Design loads (41)
- Design software (6)
- Dynamics (4)
- Fire safety design (7)
- Resilience (5)
- Robustness (20)
- Structural design (50)
- Sustainability (1)
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (20)
- Assessment project [sub-heading only] (2)
- Construction project [sub-heading only] (155)
- Demolition project (9)
- Excavation (15)
- Extension project (7)
- Groundworks project (3)
- Maintenance project (2)
- New build (84)
- Refurbishment (7)
- Remediation project (6)
- Strengthening project (3)
- Structural assessment (2)
- Underpinning project (3)
Construction period
Elements & systems
- Arch (1)
- Balconies (6)
- Balustrades (7)
- Basements (7)
- Beams (50)
- Bracing (12)
- Cables (2)
- Canopies (1)
- Ceilings (17)
- Cladding (21)
- Columns (25)
- Fasteners & connections (108)
- Fire protection (5)
- Foundations (29)
- Insulation (2)
- Light gauge steel framing (6)
- Lintels (2)
- Padstones (5)
- Parapets (5)
- PV panels (2)
- Roofs (26)
- Shear walls (2)
- Signs (3)
- Slabs (29)
- Tendons (1)
- Trusses (5)
- Wall head restraints (3)
- Walls (65)
- Wall ties (9)
- Wind posts (1)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Business practice
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS Newsletter 2 (4)
- CROSS-AUS Newsletter 3 (3)
- CROSS-AUS Newsletter 4 (3)
- CROSS-AUS Newsletter 5 (3)
- CROSS-AUS [sub-heading only] (11)
- CROSS-UK Newsletter 1 (7)
- CROSS-UK Newsletter 2 (6)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 4 (6)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 6 (6)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 8 (4)
- CROSS-UK Newsletter 9 (4)
- CROSS-UK Newsletter 10 (7)
- CROSS-UK Newsletter 11 (4)
- CROSS-UK Newsletter 12 (4)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 14 (4)
- CROSS-UK Newsletter 15 (3)
- CROSS-UK Newsletter 16 (3)
- CROSS-UK Newsletter 17 (4)
- CROSS-UK Newsletter 18 (4)
- CROSS-UK Newsletter 19 (5)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 21 (5)
- CROSS-UK Newsletter 22 (3)
- CROSS-UK Newsletter 24 (3)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 26 (4)
- CROSS-UK Newsletter 27 (2)
- CROSS-UK Newsletter 28 (4)
- CROSS-UK Newsletter 29 (5)
- CROSS-UK Newsletter 30 (8)
- CROSS-UK Newsletter 31 (4)
- CROSS-UK Newsletter 32 (5)
- CROSS-UK Newsletter 33 (3)
- CROSS-UK Newsletter 34 (6)
- CROSS-UK Newsletter 35 (7)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 37 (4)
- CROSS-UK Newsletter 38 (5)
- CROSS-UK Newsletter 39 (4)
- CROSS-UK Newsletter 40 (2)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 42 (4)
- CROSS-UK Newsletter 43 (4)
- CROSS-UK Newsletter 44 (4)
- CROSS-UK Newsletter 45 (3)
- CROSS-UK Newsletter 46 (6)
- CROSS-UK Newsletter 47 (6)
- CROSS-UK Newsletter 48 (4)
- CROSS-UK Newsletter 49 (6)
- CROSS-UK Newsletter 50 (3)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (4)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (5)
- CROSS-UK Newsletter 56 (4)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (5)
- CROSS-UK Newsletter 59 (5)
- CROSS-UK Newsletter 60 (3)
- CROSS-UK Newsletter 61 (2)
- CROSS-UK Newsletter 62 (2)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK [sub-heading only] (218)
- CROSS-US Newsletter 1 (5)
- CROSS-US Newsletter 2 (4)
- CROSS-US Newsletter 3 (3)
- CROSS-US [sub-heading only] (9)
- CROSS Newsletter (118)
- CROSS Safety Alert (11)
- CROSS Safety Report (339)
- CROSS Topic Paper (8)
- News [sub-heading only] (40)
- Safety information from CROSS [sub-heading only] (2)
- Safety information [sub-heading only] (1)
CROSS regions
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Incorrect fabrication of balustrade connection
A reporter describes how threaded bars were incorrectly used for a balustrade fixing instead of bolts which led to failure of the connection.
6 April 2023
CROSS Safety Report
Report ID: 851
Region: CROSS-UK
Accidental partial demolition of a beam
During a site visit, the permanent works design engineer noticed that hydro-demolition of the end of a floor supporting beam had taken place out of sequence. This introduced a pattern of bending moments and shear forces that were not considered in the original design.
6 April 2023
CROSS Safety Report
Report ID: 855
Region: CROSS-UK
Vertical cross bracing unbolted on-site
A reporter came across a situation where a vertical cross bracing member of a temporary steel frame structure had been unbolted on-site.
10 February 2023
CROSS Safety Report
Report ID: 861
Region: CROSS-UK
Unsafe working platform
A reporter came across an access platform supported next to an excavated foundation with unstable sides while carrying out an inspection on site.
10 March 2022
CROSS Safety Report
Report ID: 1019
Region: CROSS-UK
Unsafe excavation practices
A builder undermined the existing footing of a masonry wall without being aware of the risks.
30 July 2021
CROSS Safety Report
Report ID: 1026
Region: CROSS-UK
Concern over concrete test methods used on site
A reporter is concerned about the test method a contractor uses to justify the strength of concrete placed on site.
13 December 2022
CROSS Safety Report
Report ID: 840
Region: CROSS-UK
Incorrect steel lintel installation
A reporter came across several issues, associated with the installation of steel beam lintels, while carrying out inspection works on a 1950’s domestic property.
13 December 2021
CROSS Safety Report
Report ID: 1008
Region: CROSS-UK
Missing elements from 3D modelling
A reporter shares their experience on how their team consistently discover missing elements when they erect lattice towers and masts that have been 3D modelled.
5 September 2022
CROSS Safety Report
Report ID: 792
Region: CROSS-UK
Failure of large aluminium composite panel
This report highlights the importance of correctly designed fixings and anchoring systems for cladding panels to buildings to minimize the risk of failure.
30 April 2021
CROSS Safety Report
Report ID: 962
Region: CROSS-AUS
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.