Safety information search results
Filter your results
Building height
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 22 (2)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 34 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK [sub-heading only] (13)
- CROSS-US Newsletter 1 (1)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (7)
- (-) CROSS Safety Report (22)
- News [sub-heading only] (2)
CROSS regions
Stress fracture on temporary compact stairs
A stress fracture to a temporary access compact stair unit was identified on site by a scaffold manager.
19 March 2023
CROSS Safety Report
Report ID: 805
Region: CROSS-UK
Unsafe working platform
A reporter came across an access platform supported next to an excavated foundation with unstable sides while carrying out an inspection on site.
10 March 2022
CROSS Safety Report
Report ID: 1019
Region: CROSS-UK
Scaffold collapse and slipping clips
A photograph has been sent in by a reporter which show a scaffold that collapsed onto a parking area.
1 July 2010
CROSS Safety Report
Report ID: 152
Region: CROSS-UK
Defective imported scaffold ties
On a contract where multi lift access scaffolds had been installed for a period of up to 18 months in an exposed coastal location, it was found by a reporter on one of the regular inspections that some of the scaffold ties had failed.
1 April 2011
CROSS Safety Report
Report ID: 230
Region: CROSS-UK
Deficiencies on access scaffold
Investigation by a reporter’s firm into an access scaffold on a refurbishment contract on a city centre site brought to light a number of deficiencies which rendered the scaffold out with its design parameters.
1 April 2011
CROSS Safety Report
Report ID: 219
Region: CROSS-UK
Unauthorised scaffolding
A reporter raises concerns over a temporary scaffold support that they came across that was over a public highway.
1 July 2008
CROSS Safety Report
Report ID: 111
Region: CROSS-UK
Scaffolds and traffic protection
A reporter is concerned about the lack of consideration shown both in British Standards and industry guidance regarding the risk of impact of vehicles with scaffolds and thereby putting at risk those working on a scaffold.
1 November 2006
CROSS Safety Report
Report ID: 53
Region: CROSS-UK
Scaffold collapse
There has been a further report on a scaffolding collapse.
1 April 2007
CROSS Safety Report
Report ID: 79
Region: CROSS-UK
Failure of anchor bolts holding suspended scaffold
During the removal of a suspended scaffold, it was found that a number of the screw bolt anchors had failed.
1 July 2015
CROSS Safety Report
Report ID: 430
Region: CROSS-UK
Unsafe timber scaffolding
Concerns were raised after a reporter observed a rickety temporary scaffold that had been constructed from 4”x2” (100mm x 50mm) timbers.
1 April 2014
CROSS Safety Report
Report ID: 407
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.