Safety information search results
Filter your results
Building or structure type
Building height
Materials
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (8)
- CROSS Newsletter (5)
- CROSS Safety Report (12)
- News [sub-heading only] (1)
CROSS regions
The selection of principal designer and principal contractor
A reporter is concerned that some organisations that they would normally expect to be appointed as principal designer or principal contractor under the Construction (Design and Management) Regulations 2015 are avoiding such appointments.
17 February 2023
CROSS Safety Report
Report ID: 1150
Region: CROSS-UK
Concerns on stability require prompt action
A reporter was concerned about overall building stability during an extension and conversion project.
1 January 2010
CROSS Safety Report
Report ID: 171
Region: CROSS-UK
Apparently simple home improvement work leads to dangerous situation
Apparently simple home improvement work, consisting of reroofing and a loft conversion, resulted in a 'near miss' with potentially dangerous conditions for neighbours.
21 August 2023
CROSS Safety Report
Report ID: 1173
Region: CROSS-UK
Scaffolds and traffic protection
A reporter is concerned about the lack of consideration shown both in British Standards and industry guidance regarding the risk of impact of vehicles with scaffolds and thereby putting at risk those working on a scaffold.
1 November 2006
CROSS Safety Report
Report ID: 53
Region: CROSS-UK
Unsafe timber scaffolding
Concerns were raised after a reporter observed a rickety temporary scaffold that had been constructed from 4”x2” (100mm x 50mm) timbers.
1 April 2014
CROSS Safety Report
Report ID: 407
Region: CROSS-UK
Collapse of unsupported deep trench excavation
A worker was trapped within a partially collapsed excavation which was unsupported and not suitably benched.
1 October 2019
CROSS Safety Report
Report ID: 675
Region: CROSS-UK
Number of near misses and the regulatory regime
A reporter raises concerns about the number of investigations they are working on, or of which they are aware of.
1 January 2017
CROSS Safety Report
Report ID: 612
Region: CROSS-UK
Responsibilities of local authorities for possibly dangerous structures
A reporter, who used to be involved with building control, believes that local authorities have a duty to decide if a danger exists when a member of the public draws their attention to a potentially dangerous situation.
1 January 2014
CROSS Safety Report
Report ID: 348
Region: CROSS-UK
Combustible insulation under rainscreen cladding
Whilst walking past a tall residential building under construction, a reporter observed the facade build-up to consist of combustible insulation with a rainscreen cladding.
1 April 2018
CROSS Safety Report
Report ID: 726
Region: CROSS-UK
Collapse of domestic glass balustrade due to inadequate fixings
A firm was asked to provide professional advice regarding the replacement of a glass balustrade which had collapsed.
1 July 2018
CROSS Safety Report
Report ID: 756
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.