Safety information search results
Filter your results
Safety area
Materials
Products
Project or lifecycle stage
Construction
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
CROSS regions
Volumetric modular buildings and fire
A report has been received concerning volumetric modular construction, in the form of permanent stacked modular buildings. The reporter is concerned that the existence of extensive cavities within the compartments, combined with the lack of appropriate care when connecting the modules could lead to the concealed spread of fire and smoke, noting some recent fire events.
16 December 2021
CROSS Safety Report
Report ID: 1065
Region: CROSS-UK
No worse than existing?
This report discusses the perceived exploitation of a common fire safety argument: the existing condition.
17 February 2023
CROSS Safety Report
Report ID: 1148
Region: CROSS-UK
Non approved sealants are used with CPVC pipes and fittings
A reporter highlights a concern when non approved sealants are used with chlorinated polyvinyl chloride (CPVC) sprinkler system pipework and fittings. This can cause failures and/or leaks.
20 February 2024
CROSS Safety Report
Report ID: 1228
Region: CROSS-UK
Concern over modelling of concrete frame building for construction stage
Independent check shows inadequate modelling of concrete frame building with transfer slab.
10 March 2022
CROSS Safety Report
Report ID: 1073
Region: CROSS-UK
Fire in roofs containing PV panels
A reporter is concerned about the monitoring of photovoltaic panels and whether all the possible lessons are learned from current experience.
26 August 2022
CROSS Safety Report
Report ID: 1032
Region: CROSS-UK
Ineffective fire socks
A reporter shares their concern about how the quality of fire stopping in a residential project was found to be substandard and the potential reasons that led to this happening.
10 March 2022
CROSS Safety Report
Report ID: 1115
Region: CROSS-UK
Serious inconsistencies when installing passive fire protection
An onsite fire engineer, engaged on behalf of the end client during the construction of a new residential development, reports a significant amount of inadequately installed passive fire protection elements.
20 November 2023
CROSS Safety Report
Report ID: 1199
Region: CROSS-UK
Design criteria for firefighting lifts
A reporter is of the opinion that the design criteria for firefighting lifts should be re-evaluated.
24 May 2023
CROSS Safety Report
Report ID: 1182
Region: CROSS-UK
Junction of partitioning walls and ceilings
A potential issue has been raised with CROSS, regarding the order of works in partitioning assemblies and how these can affect the performance of compartmentation.
17 February 2023
CROSS Safety Report
Report ID: 1156
Region: CROSS-UK
The potential for expertise asymmetry in aspects of the design of tall buildings in the UK
A reporter is concerned about the potential for 'expertise asymmetry' in the fire safety domain, with a focus on smoke control systems.
20 February 2023
CROSS Safety Report
Report ID: 1143
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.