Safety information search results
Filter your results
Building height
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Content type
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 32 (2)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK [sub-heading only] (7)
- CROSS-US Newsletter 2 (2)
- CROSS-US [sub-heading only] (2)
- CROSS Newsletter (4)
- CROSS Safety Alert (1)
- CROSS Safety Report (12)
- News [sub-heading only] (1)
CROSS regions
Concerns over structural design submissions
Concern was expressed about the standard of structural design submissions presented to local authorities.
1 November 2005
CROSS Safety Report
Report ID: 14
Region: CROSS-UK
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Misleading instructions for a structural component
A reporter confirms the difficulty encountered whilst endeavouring to ensure cast-in insulated connectors supporting a parapet wall and balustrade were properly fixed.
26 August 2022
CROSS Safety Report
Report ID: 1127
Region: CROSS-UK
Unsafe design of retrofit cantilever balconies
A structural assessment of a number of new balconies being added to an existing building revealed critical concerns in respect of fixings back into the existing brickwork.
26 August 2022
CROSS Safety Report
Report ID: 1128
Region: CROSS-UK
Tension systems and post-drilled fixings
Lining failures occurred in the Boston (Big Dig) tunnel in 2006, in the Balcome rail tunnel in the UK in 2011 and in Japan’s Sasago tunnel (2012); all related to the use of unsuitable fixings.
1 March 2014
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Proper design and use of cold rolled steel frames
A reporter has been designing structures in cold rolled steel for approximately twenty years, mainly portal frame buildings, and some concerns.
1 January 2008
CROSS Safety Report
Report ID: 93
Region: CROSS-UK
Post-fixed RC anchors - assumptions lead to unsafe design
A reporter raises concerns that engineers may be using post-fixed anchors without complying with the manufacturer's guidance or ensuring that their design assumptions are applicable.
1 January 2015
CROSS Safety Report
Report ID: 443
Region: CROSS-UK
Incorrectly designed safety system
A reporter raises concerns about the way in which the structure for a safety system had been modelled using an inappropriate software package.
1 January 2016
CROSS Safety Report
Report ID: 527
Region: CROSS-UK
Steel balconies fixed to precast hollowcore floor planks
A reporter is concerned about the suitability of providing a retrofitted steel balcony requiring moment connections to the sides of typical hollowcore floor planks.
1 July 2017
CROSS Safety Report
Report ID: 620
Region: CROSS-UK
Design deficiencies in long span steelwork portal
A firm commissioned to design steel joints on a large portal frame structure noticed that there was lack of restraint to a series of long span rafters.
1 October 2013
CROSS Safety Report
Report ID: 329
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.