Safety information search results
Filter your results
Building or structure type
Building height
Materials
Products
Project or lifecycle stage
Construction
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
CROSS regions
Private Building Control data protection use
A reporter needed details of a domestic extension from a local authority who said that an application had been made for the original work by a private company, but under the Data Protection Act they could not release any drawings or documentation.
6 April 2023
CROSS Safety Report
Report ID: 825
Region: CROSS-UK
The selection of principal designer and principal contractor
A reporter is concerned that some organisations that they would normally expect to be appointed as principal designer or principal contractor under the Construction (Design and Management) Regulations 2015 are avoiding such appointments.
17 February 2023
CROSS Safety Report
Report ID: 1150
Region: CROSS-UK
Overloading of existing steelwork frame
Inadequate structural investigations and design of alteration works leads to damage to multi-storey flats.
10 March 2022
CROSS Safety Report
Report ID: 1033
Region: CROSS-UK
Learning from historic failures
This report is not to discuss or preempt the findings of the investigation but to draw attention to historical failures where ground conditions have been highlighted in subsequent Health and Safety Executive (HSE) reports on the incidents.
1 January 2010
CROSS Safety Report
Report ID: 154
Region: CROSS-UK
Cladding subcontractor change of connection strategy led to failure
As part of their final design submission, a cladding subcontractor changed the connection strategy for their cladding system. The project structural engineer did not identify the design change and the cladding loading resulted in excessive deflection and some twisting of the primary perimeter steel.
21 August 2023
CROSS Safety Report
Report ID: 1189
Region: CROSS-UK
'Design' for alterations to a dwelling carried out by an unsuitable person
A reporter was called upon to review a design for the removal of a loadbearing wall during the refurbishment of a residence. A builder was already on site but had stopped work since they considered the engineering design to be unsatisfactory and the structural designer was not responding to their queries. The reporter found that the structural design being followed was far from competent.
21 August 2023
CROSS Safety Report
Report ID: 1236
Region: CROSS-UK