Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (17)
- Assessment project [sub-heading only] (2)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (44)
- Demolition project (4)
- Excavation (2)
- Extension project (6)
- Maintenance project (1)
- New build (9)
- Refurbishment (6)
- Remediation project (5)
- Repair project (4)
- Strengthening project (2)
- Structural assessment (3)
Method of construction
Elements & systems
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-UK Newsletter 1 (2)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 9 (2)
- CROSS-UK Newsletter 10 (2)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (3)
- CROSS-UK Newsletter 13 (1)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 15 (2)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 17 (2)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 20 (4)
- CROSS-UK Newsletter 23 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (2)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (2)
- CROSS-UK Newsletter 64 (2)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (60)
- CROSS Newsletter (26)
- CROSS Safety Alert (2)
- CROSS Safety Report (103)
- News [sub-heading only] (11)
CROSS regions
Provision for movement in clay brickwork facades
A reporter raises concerns over the detailing and construction of horizontal movement joints in clay brickwork facades.
2 February 2023
CROSS Safety Report
Report ID: 860
Region: CROSS-UK
Change in use results in masonry wall failure
A room with walls of traditional cavity and single skin masonry was lined with plywood and used for storage of wood chips. No thought was given to the lateral pressure on the walls which eventually failed.
6 April 2023
CROSS Safety Report
Report ID: 884
Region: CROSS-UK
Collapse of external brick wall during demolition works
A section of an external brick wall of a building collapsed suddenly and unexpectedly part way through a demolition contract.
13 December 2022
CROSS Safety Report
Report ID: 875
Region: CROSS-UK
Collapse of brick arch overbridge during demolition
A reporter describes a project where a flanking brick arch collapsed during the demolition of two multi-span bridges over rail lines.
30 June 2022
CROSS Safety Report
Report ID: 573
Region: CROSS-UK
Retaining wall collapsed onto highway due to heavy rain
A 2.5m high sandstone retaining wall collapsed onto a highway following a period of heavy rain.
1 June 2022
CROSS Safety Report
Report ID: 791
Region: CROSS-UK
Excessive surcharge at the back of a retaining wall
A reporter raises concerns about excessive surcharging at the top of a small retaining wall which was supporting the garden of the property.
2 February 2023
CROSS Safety Report
Report ID: 834
Region: CROSS-UK
Stone cladding panel concerns
A reporter is concerned in respect of the risk of failure of stone cladding panels.
9 August 2022
CROSS Safety Report
Report ID: 1069
Region: CROSS-UK
Dangerous building work on domestic project
Temporary propping fails during works to a semi-detached property putting the whole building at risk of collapse.
10 March 2022
CROSS Safety Report
Report ID: 1062
Region: CROSS-UK
Vegetation damage to railway arches
Lack of clarity as to maintenance responsibilities leads to degradation of railway arches.
6 June 2022
CROSS Safety Report
Report ID: 1064
Region: CROSS-UK
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.