Safety information search results
Filter your results
Building or structure type
- Bridges (15)
- Buildings
(120)
- Car parks (2)
- Commercial (6)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (4)
- Health care (1)
- Industrial buildings (1)
- Public, religious & civic buildings (3)
- Recreational buildings (1)
- Residential (38)
- Stadiums (1)
- Storage buildings (3)
- Tall buildings (3)
- Theatres & other entertainment buildings (5)
- Transport buildings (1)
- Buried pipes & culverts (2)
- Masts & towers (9)
- Railways (3)
- Retaining structures (9)
- Roads (4)
- Sewers (1)
- Temporary structures (13)
Materials
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (12)
- Assessment project [sub-heading only] (1)
- Construction project [sub-heading only] (90)
- Demolition project (4)
- Excavation (5)
- Extension project (3)
- Groundworks project (1)
- New build (49)
- Refurbishment (6)
- Remediation project (3)
- Strengthening project (2)
- Structural assessment (1)
- Underpinning project (3)
Method of construction
Elements & systems
- Arch (1)
- Balconies (5)
- Balustrades (4)
- Basements (4)
- Beams (29)
- Bracing (6)
- Cables (1)
- Ceilings (8)
- Cladding (9)
- Columns (14)
- Fasteners & connections (61)
- Fire protection (3)
- Foundations (22)
- Insulation (1)
- Light gauge steel framing (3)
- Lintels (2)
- Padstones (3)
- Parapets (3)
- Roofs (12)
- Shear walls (2)
- Signs (2)
- Slabs (10)
- Trusses (4)
- Wall head restraints (3)
- Walls (38)
- Wall ties (6)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Public incidents
Content type
- CROSS-AUS Newsletter 2 (2)
- CROSS-AUS Newsletter 3 (2)
- CROSS-AUS Newsletter 4 (2)
- CROSS-AUS Newsletter 5 (2)
- CROSS-AUS [sub-heading only] (6)
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 2 (3)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (3)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 6 (3)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 9 (4)
- CROSS-UK Newsletter 10 (7)
- CROSS-UK Newsletter 11 (2)
- CROSS-UK Newsletter 12 (3)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 16 (3)
- CROSS-UK Newsletter 17 (2)
- CROSS-UK Newsletter 18 (3)
- CROSS-UK Newsletter 19 (4)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 21 (4)
- CROSS-UK Newsletter 22 (3)
- CROSS-UK Newsletter 24 (3)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 28 (4)
- CROSS-UK Newsletter 29 (5)
- CROSS-UK Newsletter 30 (7)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 32 (2)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 34 (3)
- CROSS-UK Newsletter 35 (4)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (3)
- CROSS-UK Newsletter 39 (2)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 43 (3)
- CROSS-UK Newsletter 44 (4)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 46 (4)
- CROSS-UK Newsletter 47 (4)
- CROSS-UK Newsletter 48 (4)
- CROSS-UK Newsletter 49 (5)
- CROSS-UK Newsletter 50 (3)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (3)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (3)
- CROSS-UK Newsletter 62 (2)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (133)
- CROSS-US Newsletter 2 (4)
- CROSS-US Newsletter 3 (3)
- CROSS-US [sub-heading only] (4)
- CROSS Newsletter (73)
- CROSS Safety Alert (1)
- CROSS Safety Report (202)
- News [sub-heading only] (18)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
Roof collapse of warehouse structure under rainwater ponding
This report highlights the structural risk caused by rainwater ponding on relatively flat roofs.
10 May 2021
CROSS Safety Report
Report ID: 969
Region: CROSS-US
Unsafe working platform
A reporter came across an access platform supported next to an excavated foundation with unstable sides while carrying out an inspection on site.
10 March 2022
CROSS Safety Report
Report ID: 1019
Region: CROSS-UK
Unsafe excavation practices
A builder undermined the existing footing of a masonry wall without being aware of the risks.
30 July 2021
CROSS Safety Report
Report ID: 1026
Region: CROSS-UK
Incorrect steel lintel installation
A reporter came across several issues, associated with the installation of steel beam lintels, while carrying out inspection works on a 1950’s domestic property.
13 December 2021
CROSS Safety Report
Report ID: 1008
Region: CROSS-UK
Failures of cold formed steel floor systems during construction
This report describes numerous collapses during construction of cold formed steel floor systems caused by lack of bracing/fastening and overloading of an incomplete structure.
10 May 2021
CROSS Safety Report
Report ID: 997
Region: CROSS-US
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
The use of cast-in ferrules as structural connections
This report highlights several problems that can arise with structural connections between elements when cast-in ferrules (also known as threaded inserts) are used for the anchorage of reinforcing bars.
30 April 2021
CROSS Safety Report
Report ID: 993
Region: CROSS-AUS
Failure of large aluminium composite panel
This report highlights the importance of correctly designed fixings and anchoring systems for cladding panels to buildings to minimize the risk of failure.
30 April 2021
CROSS Safety Report
Report ID: 962
Region: CROSS-AUS
Steel column erection anchoring connection failure injured worker
This report describes how a construction worker was injured during the erection of a steel column due to shortcomings in erection procedures and inadequacies in a column base connection.
10 May 2021
CROSS Safety Report
Report ID: 992
Region: CROSS-US
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK