Unsafe instructions from a building inspector
On the site for an extension to a domestic property, a building inspector instructed a contractor to excavate a deep trench. The trench was in front of the neighbour's adjacent boundary retaining wall, and left a deep vertical face under the house being extended.
10 March 2022
CROSS Safety Report
Report ID: 1086
Region: CROSS-UK
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Dangerous alteration work results in two terraced houses being demolished
Two mid terrace properties forming four flats had been underpinned and excavated to form a new basement whilst simultaneously removing internal and rear walls. This left the building in a dangerous condition and subject to a demolition order from the local council.
20 February 2024
CROSS Safety Report
Report ID: 1274
Region: CROSS-UK
Structural failure of older timber connections
A reporter shares three examples of the structural failure or inadequacies of connections in existing timber structures that they have encountered.
13 December 2021
CROSS Safety Report
Report ID: 1040
Region: CROSS-UK
Do planning applications hinder safety improvements?
A potential issue about the reconstruction of a structurally inadequate external fire escape from a building has been raised with CROSS.
17 November 2022
CROSS Safety Report
Report ID: 1043
Region: CROSS-UK
Inadequate temporary works on domestic project
An example of inadequate temporary works on a project, and problems reporting the safety issue to the authorities.
14 December 2021
CROSS Safety Report
Report ID: 1044
Region: CROSS-UK
Concerns about punching shear in a flat slab
This report concerns potential shear failures in flat slabs. This originates from inconsistent design and detailing of the shear reinforcement where a proprietary shear link system is assumed in the design but not followed in detailing.
13 December 2021
CROSS Safety Report
Report ID: 1050
Region: CROSS-UK
Concerns over robustness of some 20 year old buildings
Concerns about the robustness of several two-storey buildings dating from the early 2000s.
6 June 2022
CROSS Safety Report
Report ID: 1051
Region: CROSS-UK
Fire in roofs containing PV panels
A reporter is concerned about the monitoring of photovoltaic panels and whether all the possible lessons are learned from current experience.
26 August 2022
CROSS Safety Report
Report ID: 1032
Region: CROSS-UK
Ineffective fire socks
A reporter shares their concern about how the quality of fire stopping in a residential project was found to be substandard and the potential reasons that led to this happening.
10 March 2022
CROSS Safety Report
Report ID: 1115
Region: CROSS-UK