Dangerous building work on domestic project
Temporary propping fails during works to a semi-detached property putting the whole building at risk of collapse.
10 March 2022
CROSS Safety Report
Report ID: 1062
Region: CROSS-UK
Vegetation damage to railway arches
Lack of clarity as to maintenance responsibilities leads to degradation of railway arches.
6 June 2022
CROSS Safety Report
Report ID: 1064
Region: CROSS-UK
RAAC assessment undertaken by persons not suitably experienced
A reinforced aerated autoclaved concrete (RAAC) assessment was carried out by persons who did not appear to have appropriate experience, potentially putting building users at risk of harm.
21 August 2023
CROSS Safety Report
Report ID: 1224
Region: CROSS-UK
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Inadequate design for basement works
An inadequate structural design for alterations to a basement led to structural distress within a substantial five-storey townhouse.
21 November 2022
CROSS Safety Report
Report ID: 1132
Region: CROSS-UK
Poorly applied external insulation on buildings
This report concerns external insulation on buildings being inadequately applied and fixed, with poor control of the workmanship standards, leading to potential safety concerns and damage to the property.
21 August 2023
CROSS Safety Report
Report ID: 1203
Region: CROSS-UK
Concerns over corrosion of dissimilar metals in fixing cavity wall tie systems
A reporter is concerned about corrosion that may occur between dissimilar metals that can be used in cavity wall tie systems. The reporter has noted that stainless steel and carbon steel may be fixed together in wall cavities, which are damp environments, and that corrosion of dissimilar metals in contact may occur.
24 May 2023
CROSS Safety Report
Report ID: 1186
Region: CROSS-UK
Collapse of folded plate timber roof at a school
This report is about a critical safety issue concerning folded timber roofs, in various settings, including over school halls.
18 October 2023
CROSS Safety Report
Report ID: 1160
Region: CROSS-UK
Failure of cantilevered stone staircase
During the renovation and change-of-use conversion of a former minor stately home built around 1830, under pedestrian loading, a ‘cantilevered’ stone staircase partially collapsed without warning.
21 February 2023
CROSS Safety Report
Report ID: 1147
Region: CROSS-UK
'Design' for alterations to a dwelling carried out by an unsuitable person
A reporter was called upon to review a design for the removal of a loadbearing wall during the refurbishment of a residence. A builder was already on site but had stopped work since they considered the engineering design to be unsatisfactory and the structural designer was not responding to their queries. The reporter found that the structural design being followed was far from competent.
21 August 2023
CROSS Safety Report
Report ID: 1236
Region: CROSS-UK