Safety information search results
Filter your results
Safety area
Building height
Materials
Products
Project or lifecycle stage
Construction
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
CROSS regions
Volumetric modular buildings and fire
A report has been received concerning volumetric modular construction, in the form of permanent stacked modular buildings. The reporter is concerned that the existence of extensive cavities within the compartments, combined with the lack of appropriate care when connecting the modules could lead to the concealed spread of fire and smoke, noting some recent fire events.
16 December 2021
CROSS Safety Report
Report ID: 1065
Region: CROSS-UK
Risk of failure of untested vibration isolators with seismic restraint
Risk of failure of vibration isolators with integral seismic restraint being used without independent third party testing
7 November 2023
CROSS Safety Report
Report ID: 1230
Region: CROSS-AUS
Inadequate design and procurement of large steel roof structure
This report demonstrates the importance of following the correct process for project procurement, including preparing a detailed design and project specification, and certificating compliance with the relevant building codes. It also covers the potential consequences when shortcuts are taken.
30 March 2023
CROSS Safety Report
Report ID: 1123
Region: CROSS-AUS
Design criteria for firefighting lifts
A reporter is of the opinion that the design criteria for firefighting lifts should be re-evaluated.
24 May 2023
CROSS Safety Report
Report ID: 1182
Region: CROSS-UK
Fire safety management during building works
A reporter shares multiple and various concerns about the maintenance of existing fire safety measures during a period of building work, as well as the approach taken to manage building evacuation for persons with reduced mobility (PRM).
21 August 2023
CROSS Safety Report
Report ID: 1193
Region: CROSS-UK
Junction of partitioning walls and ceilings
A potential issue has been raised with CROSS, regarding the order of works in partitioning assemblies and how these can affect the performance of compartmentation.
17 February 2023
CROSS Safety Report
Report ID: 1156
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.