Safety information search results
Filter your results
Building or structure type
Materials
Products
Project or lifecycle stage
Design
Fire incident response
Method of construction
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 4 (2)
- CROSS-AUS [sub-heading only] (4)
- CROSS-UK Newsletter 2 (2)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 18 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 28 (2)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (2)
- CROSS-UK Newsletter 48 (2)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (2)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK [sub-heading only] (27)
- CROSS Newsletter (19)
- CROSS Safety Report (45)
- News [sub-heading only] (7)
CROSS regions
Dangerous building work on domestic project
Temporary propping fails during works to a semi-detached property putting the whole building at risk of collapse.
10 March 2022
CROSS Safety Report
Report ID: 1062
Region: CROSS-UK
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Steelwork connection design
A reporter was asked to design connections for a multi-storey building for which the frame had been designed by another engineer. The result was a near collapse situation.
1 March 2006
CROSS Safety Report
Report ID: 25
Region: CROSS-UK
Girder collapse
The failure was of a two-storey high trussed girder with a 36m span, designed to carry a composite steel and concrete floor at the lower level and a trussed roof at higher level.
1 March 2006
CROSS Safety Report
Report ID: 30
Region: CROSS-UK
Very slender props
A reporter noticed prop that did not have ties installed while carrying out a site inspection.
1 July 2007
CROSS Safety Report
Report ID: 34
Region: CROSS-UK
Failure of beams in listed building
Conversion and refurbishment work on a listed building led to structural failures of beams and subsequent difficulties in resolving safety matters between the various agencies involved.
30 July 2021
CROSS Safety Report
Report ID: 1016
Region: CROSS-UK
Incorrect steel lintel installation
A reporter came across several issues, associated with the installation of steel beam lintels, while carrying out inspection works on a 1950’s domestic property.
13 December 2021
CROSS Safety Report
Report ID: 1008
Region: CROSS-UK
Inadequate design for basement works
An inadequate structural design for alterations to a basement led to structural distress within a substantial five-storey townhouse.
21 November 2022
CROSS Safety Report
Report ID: 1132
Region: CROSS-UK
Connection fixity considerations for steel frame modelling
This report concerns the modelling of joints when using computer programs. In some cases, engineers are applying rotational releases to joints in models but subsequently designing the connections as rigid. This leaves a fundamental mismatch between analysis and design which may lead to unsafe structural connections argues a reporter.
17 November 2022
CROSS Safety Report
Report ID: 1139
Region: CROSS-UK
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.