Safety information search results
Filter your results
Safety area
Building or structure type
Building height
Products
Project or lifecycle stage
Construction
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
CROSS regions
Sudden loss of ground support
SCOSS has logged several incidents of unstable ground below structures where voids have opened up; so far without loss of life (UK), but pictures of the incidents show that safety could easily have been compromised, severely.
1 July 2017
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Control of temporary works excavation
Poor, high-water content excavated material, slipped into a 15-20m deep borrow pit. The material had slipped to the bottom of the pit partially burying excavation, crushing and screening equipment. If this slip had occurred during working hours, the impact could have been very serious.
17 November 2022
CROSS Safety Report
Report ID: 1146
Region: CROSS-UK
Long term risks for ground anchors
A reporter is concerned about the inspection and maintenance of ground anchors that are used for strategic flood defences.
1 October 2007
CROSS Safety Report
Report ID: 87
Region: CROSS-UK
Lift pit excavation hazards
A reporter came across an unsafe deep excavation and asks how a geotechnical engineer views the risk of excavation collapse.
1 July 2019
CROSS Safety Report
Report ID: 821
Region: CROSS-AUS
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.