Safety information search results
Filter your results
Products
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 2 (2)
- CROSS-AUS Newsletter 5 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK [sub-heading only] (10)
- CROSS-US Newsletter 2 (3)
- CROSS-US [sub-heading only] (3)
- CROSS Newsletter (7)
- CROSS Safety Report (21)
- News [sub-heading only] (2)
CROSS regions
Poor quality design leads to failure for a small design and build contract
An example of a small design and build contract where poor design and management led to an inadequate structure being built.
6 June 2022
CROSS Safety Report
Report ID: 1088
Region: CROSS-UK
Grouting of joints between load-bearing prefabricated concrete members
This report highlights the risk of failure if grouted joints between load-bearing prefabricated concrete members are not designed and installed correctly.
30 April 2021
CROSS Safety Report
Report ID: 961
Region: CROSS-AUS
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
Roof collapse at a social club
This is a report about a roof collapse that occurred, in about 1985, because only half as many parallel faced timber roof trusses were installed as there should have been.
30 June 2022
CROSS Safety Report
Report ID: 942
Region: CROSS-UK
Wind damage to secondary elements
A period of storm force winds, with wind speeds approaching design levels, resulted in damage to secondary roofing and cladding elements.
1 July 2006
CROSS Safety Report
Report ID: 42
Region: CROSS-UK
Asymmetric bridge design and construction – a near miss
During the construction stage of an arch footbridge a design error was identified that had been indirectly revealed by an associated error in construction.
1 October 2011
CROSS Safety Report
Report ID: 262
Region: CROSS-UK
Litigation on divided responsibilities
Divided design responsibilities, says a reporter, are a common source of litigation.
1 January 2013
CROSS Safety Report
Report ID: 229
Region: CROSS-UK
Risk in notching timber studs
During the construction of a block of apartments a reporter found a couple of locations on an external fourth floor wall where the load-bearing studs had been notched well past permissible depths.
1 January 2011
CROSS Safety Report
Report ID: 209
Region: CROSS-UK
Lack of lateral stability in steel frame
Concerns were raised after the steel frame of a building was found to have a lack of horizontal and vertical bracing.
1 July 2016
CROSS Safety Report
Report ID: 540
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.