Safety information search results
Filter your results
Products
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 1 (2)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (15)
- CROSS Newsletter (9)
- CROSS Safety Report (19)
- News [sub-heading only] (6)
CROSS regions
Failure to check designs produced by software
Concerns were raised about a proprietary design software after a building control officer noticed a regular error appearing while checking calculations provided to them.
1 January 2016
CROSS Safety Report
Report ID: 538
Region: CROSS-UK
Number of near misses and the regulatory regime
A reporter raises concerns about the number of investigations they are working on, or of which they are aware of.
1 January 2017
CROSS Safety Report
Report ID: 612
Region: CROSS-UK
Columns missing due to 3D modelling
A new eight storey residential concrete frame building was being constructed and several columns were omitted from the ground and first floor level drawings, says a reporter.
1 January 2017
CROSS Safety Report
Report ID: 614
Region: CROSS-UK
Building control and budget limitations
A reporter is concerned that many local authorities do not seem to have the knowledge or impetus to address some technical issues even if the legislation is there for them as a course of action.
1 January 2015
CROSS Safety Report
Report ID: 389
Region: CROSS-UK
Inadequate structural design of school extension
On review of a design for a school extension, a reporter noted several major issues including an almost total lack of vertical bracing throughout the extension.
1 October 2016
CROSS Safety Report
Report ID: 597
Region: CROSS-UK
Inadequate end bearings for transfer beams
Whilst advising a steel fabricator on tendering for a transfer structure steel frame, a reporter's firm noticed a serious design error with the bearing pressures at the supports of a transfer beam.
1 October 2017
CROSS Safety Report
Report ID: 644
Region: CROSS-UK
Response to report 614 on missing columns from drawings
A reporter shares their views on how to implement robust checking systems for Building Information Modelling (BIM) models.
1 January 2020
CROSS Safety Report
Report ID: 645
Region: CROSS-UK
Concrete grade confusion in software
A reporter noticed that the design calculation report generated by a proprietary software package called for ‘concrete characteristic strength = 45N/mm2’, but did not confirm whether this refers to the cylinder or cube strength.
1 April 2019
CROSS Safety Report
Report ID: 788
Region: CROSS-UK
Unconservative design of flat slab due to software modelling issues
A reporter discusses how a design/modelling problem caused an under-designed reinforced concrete (RC) slab to be constructed.
1 April 2020
CROSS Safety Report
Report ID: 886
Region: CROSS-UK