- CROSS-AUS Newsletter 5 (2)
- CROSS-UK Newsletter 1 (3)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 4 (3)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 62 (2)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (3)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (11)
- CROSS Newsletter (2)
- CROSS Safety Alert (2)
- CROSS Safety Report (39)
- News [sub-heading only] (5)
CROSS regions
Excessive surcharge at the back of a retaining wall
A reporter raises concerns about excessive surcharging at the top of a small retaining wall which was supporting the garden of the property.
2 February 2023
CROSS Safety Report
Report ID: 834
Region: CROSS-UK
Retaining wall collapsed onto highway due to heavy rain
A 2.5m high sandstone retaining wall collapsed onto a highway following a period of heavy rain.
1 June 2022
CROSS Safety Report
Report ID: 791
Region: CROSS-UK
Concerns over old wall misuse
A reporter is concerned about the stability of a boundary wall after a neighbour carried out works adjacent to it.
13 December 2022
CROSS Safety Report
Report ID: 846
Region: CROSS-UK
Grouting of joints between load-bearing prefabricated concrete members
This report highlights the risk of failure if grouted joints between load-bearing prefabricated concrete members are not designed and installed correctly.
30 April 2021
CROSS Safety Report
Report ID: 961
Region: CROSS-AUS
Design of internal partitions for horizontal loads
This report draws attention to the requirement for internal partitions to be designed for horizontal loads from wind and seismic effects in accordance with Section B of the Australian National Construction Code (NCC).
30 April 2021
CROSS Safety Report
Report ID: 1000
Region: CROSS-AUS
Incorrect steel lintel installation
A reporter came across several issues, associated with the installation of steel beam lintels, while carrying out inspection works on a 1950’s domestic property.
13 December 2021
CROSS Safety Report
Report ID: 1008
Region: CROSS-UK
Delay by party wall surveyor adds to risk
A party wall surveyor causes delay which prevents a dangerous wall from being made safe in a timely manner.
10 March 2022
CROSS Safety Report
Report ID: 1010
Region: CROSS-UK
Slipform temporary works design
A reporter was performing a CAT III check on a 14 storey slipform design when they discovered that the temporary works design was inadequate.
5 September 2022
CROSS Safety Report
Report ID: 809
Region: CROSS-UK
Collapse of external brick wall during demolition works
A section of an external brick wall of a building collapsed suddenly and unexpectedly part way through a demolition contract.
13 December 2022
CROSS Safety Report
Report ID: 875
Region: CROSS-UK
Change in use results in masonry wall failure
A room with walls of traditional cavity and single skin masonry was lined with plywood and used for storage of wood chips. No thought was given to the lateral pressure on the walls which eventually failed.
6 April 2023
CROSS Safety Report
Report ID: 884
Region: CROSS-UK
Submit a report