- Alteration & conversion project (5)
- Assessment project [sub-heading only] (3)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (26)
- Demolition project (1)
- Excavation (1)
- Extension project (4)
- Groundworks project (2)
- New build (4)
- Refurbishment (3)
- Remediation project (2)
- Repair project (2)
- Strengthening project (1)
- Structural assessment (9)
Construction period
Method of construction
Elements & systems
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
CROSS regions
Construction period of RAAC planks
A reporter says that there are structural issues with reinforced autoclaved aerated concrete (RAAC) panels installed in a building as late as 1998. This date is significantly later than previous reports suggest as the last significant use of RAAC elements in the UK.
20 February 2023
CROSS Safety Report
Report ID: 954
Region: CROSS-UK
Masonry panels rock in wind due to missing wall ties
Wall ties designed to connect masonry partitions to adjacent steelwork framing were not installed leaving the masonry walls unrestrained. Walls were seen to be rocking in high winds.
17 February 2023
CROSS Safety Report
Report ID: 931
Region: CROSS-UK
Delay by party wall surveyor adds to risk
A party wall surveyor causes delay which prevents a dangerous wall from being made safe in a timely manner.
10 March 2022
CROSS Safety Report
Report ID: 1010
Region: CROSS-UK
Overall stability of building proposed to be provided by metal framing and plasterboard
Metal framing and plasterboard was used to provide lateral stability to a building. The form of construction was later deemed to be unsuitable and extensive remedial works had to be carried out.
24 May 2023
CROSS Safety Report
Report ID: 468
Region: CROSS-UK
Painted faying surfaces leads to connections with insufficient load capacity
Painted, rather than the required unpainted connection faying surfaces, were identified by the Resident Engineer of a reporter's firm during the erection of a primary frame for a large project. The painted surfaces resulted in the connections not having sufficient load carrying capacity and necessitated remedial works.
20 November 2023
CROSS Safety Report
Report ID: 896
Region: CROSS-UK
RAAC planks in a 1970s shopping centre
An existing large shopping centre built circa 1975 had a number of external storerooms and loading bays with roofs constructed using reinforced autoclaved aerated concrete (RAAC) planks. The planks had deflected to the extent that they needed replacing.
20 February 2023
CROSS Safety Report
Report ID: 1155
Region: CROSS-UK
Control of temporary works excavation
Poor, high-water content excavated material, slipped into a 15-20m deep borrow pit. The material had slipped to the bottom of the pit partially burying excavation, crushing and screening equipment. If this slip had occurred during working hours, the impact could have been very serious.
17 November 2022
CROSS Safety Report
Report ID: 1146
Region: CROSS-UK
Failure of cantilevered stone staircase
During the renovation and change-of-use conversion of a former minor stately home built around 1830, under pedestrian loading, a ‘cantilevered’ stone staircase partially collapsed without warning.
21 February 2023
CROSS Safety Report
Report ID: 1147
Region: CROSS-UK
Frustration about getting a response to a public safety concern
A member of the public reported a partially collapsed retaining structure to bodies they believed could be the responsible authority. Despite continued efforts to get attention to the issue, there was no apparent action to address the concern. This raised the reporter’s concern for public safety.
20 February 2023
CROSS Safety Report
Report ID: 1154
Region: CROSS-UK
The selection of principal designer and principal contractor
A reporter is concerned that some organisations that they would normally expect to be appointed as principal designer or principal contractor under the Construction (Design and Management) Regulations 2015 are avoiding such appointments.
17 February 2023
CROSS Safety Report
Report ID: 1150
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.