Safety information search results
Filter your results
Products
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK [sub-heading only] (17)
- CROSS-US Newsletter 2 (2)
- CROSS-US [sub-heading only] (2)
- CROSS Newsletter (10)
- CROSS Safety Report (27)
- News [sub-heading only] (6)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
Inadequate design for basement works
An inadequate structural design for alterations to a basement led to structural distress within a substantial five-storey townhouse.
21 November 2022
CROSS Safety Report
Report ID: 1132
Region: CROSS-UK
Combination load cases in proprietary software cause concern
A reporter is concerned about a widely used software package that does not, in their opinion, generate load combinations in accordance with the Eurocodes being followed.
18 October 2023
CROSS Safety Report
Report ID: 1170
Region: CROSS-UK
Cladding subcontractor change of connection strategy led to failure
As part of their final design submission, a cladding subcontractor changed the connection strategy for their cladding system. The project structural engineer did not identify the design change and the cladding loading resulted in excessive deflection and some twisting of the primary perimeter steel.
21 August 2023
CROSS Safety Report
Report ID: 1189
Region: CROSS-UK
Effect of staff change on a design
A reporter illustrates how risk can be generated from staff turnover.
1 October 2012
CROSS Safety Report
Report ID: 277
Region: CROSS-UK
Checking at a price
In relation to the checking of calculations on behalf of local authorities for building regulation submissions a reporter is concerned about checking engineers who are paid very low hourly rates.
1 October 2011
CROSS Safety Report
Report ID: 227
Region: CROSS-UK
Design deficiencies in calculations submitted to a Local Authority
A Local Authority Building Control manager has sent a list which gives twenty nine of the more serious design review queries raised by the building control structural checking process over the last five years.
1 October 2010
CROSS Safety Report
Report ID: 210
Region: CROSS-UK
Steelwork splices do not match design calculations
Remedial works had to be carried out after it was found that steelwork splices on site did not match calculations which were retrospectively provided by a contractor.
29 March 2021
CROSS Safety Report
Report ID: 916
Region: CROSS-UK
The myth of quality assurance
This report argues that to achieve the objective of good quality construction that satisfies the design intent there is no substitute for the practice of regular site inspections being conducted by the original design engineer. It questions whether there has been too much reliance on the process of quality assurance systems to the detriment of the quality of the end product.
25 November 2021
CROSS Safety Report
Report ID: 960
Region: CROSS-AUS
Incorrectly designed safety system
A reporter raises concerns about the way in which the structure for a safety system had been modelled using an inappropriate software package.
1 January 2016
CROSS Safety Report
Report ID: 527
Region: CROSS-UK
Steel balconies fixed to precast hollowcore floor planks
A reporter is concerned about the suitability of providing a retrofitted steel balcony requiring moment connections to the sides of typical hollowcore floor planks.
1 July 2017
CROSS Safety Report
Report ID: 620
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.