Safety information search results
Filter your results
Building or structure type
Building height
Project or lifecycle stage
Construction
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
CROSS regions
Tower crane - failure of loadbearing part
A tower crane suffered a failure of one of its four main legs approximately 12m below the slew ring.
1 October 2014
CROSS Safety Report
Report ID: 399
Region: CROSS-UK
Failure of supposedly grade 10.9 bolts
There was a high potential for collapse when supposedly grade 10.9 high strength holding bolts failed on a crane base.
1 October 2016
CROSS Safety Report
Report ID: 585
Region: CROSS-UK
Tower crane foundation design error
Whilst carrying out an independent design check on a tower crane foundation design, a reporter discovered that the piles used on site did not have the required tension capacity.
1 July 2018
CROSS Safety Report
Report ID: 662
Region: CROSS-UK
Casting, transporting and installing precast concrete kerbs
A reporter shares their experience of how collaborative engineering thinking involving several parties enabled a design solution to be found that could be constructed safely.
1 October 2018
CROSS Safety Report
Report ID: 778
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.