Safety information search results
Filter your results
Building or structure type
- Buildings
(10)
- Car parks (1)
- Commercial (7)
- Education, science & art buildings (8)
- (-) Health care (10)
- Industrial buildings (3)
- Laboratory buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (1)
- Recreational buildings (1)
- Residential (8)
- Stadiums (1)
- Theatres & other entertainment buildings (2)
- Transport buildings (1)
- Railways (1)
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Locations
CROSS regions
Major safety defects in hospital
A number of construction defects were found in a hospital following the inspection of the external wall system.
29 March 2021
CROSS Safety Report
Report ID: 826
Region: CROSS-UK
Volumetric modular buildings and fire
A report has been received concerning volumetric modular construction, in the form of permanent stacked modular buildings. The reporter is concerned that the existence of extensive cavities within the compartments, combined with the lack of appropriate care when connecting the modules could lead to the concealed spread of fire and smoke, noting some recent fire events.
16 December 2021
CROSS Safety Report
Report ID: 1065
Region: CROSS-UK
Fire protection to structure by cavity barriers
A reporter is concerned about a potential misconception in the construction industry regarding the role of cavity barriers and the impact their design and installation can have on the structural performance of a building.
20 November 2023
CROSS Safety Report
Report ID: 1231
Region: CROSS-UK
Risk of failure of untested vibration isolators with seismic restraint
Risk of failure of vibration isolators with integral seismic restraint being used without independent third party testing
7 November 2023
CROSS Safety Report
Report ID: 1230
Region: CROSS-AUS
Concerns about punching shear in a flat slab
This report concerns potential shear failures in flat slabs. This originates from inconsistent design and detailing of the shear reinforcement where a proprietary shear link system is assumed in the design but not followed in detailing.
13 December 2021
CROSS Safety Report
Report ID: 1050
Region: CROSS-UK
Intumescent paint application
A report has been received regarding issues of detailing by following the relevant advice provided from an intumescent paint supplier.
6 June 2022
CROSS Safety Report
Report ID: 1113
Region: CROSS-UK
Floor vibration in a gym
Vibration within the floor structure of a second floor gym gives rise to concern of structural resonance and possible fatigue of structural members.
26 August 2022
CROSS Safety Report
Report ID: 1106
Region: CROSS-UK
Junction of partitioning walls and ceilings
A potential issue has been raised with CROSS, regarding the order of works in partitioning assemblies and how these can affect the performance of compartmentation.
17 February 2023
CROSS Safety Report
Report ID: 1156
Region: CROSS-UK
Inadequate brick ties in gable walls
A reporter was called to council houses at four different sites, whose upper triangle of cavity wall brickwork on the gable end had fallen out, due to not being tied into the roof.
1 July 2019
CROSS Safety Report
Report ID: 785
Region: CROSS-UK
Failure of RAAC planks in schools
A reporter was asked to investigate a reinforced autoclaved aerated concrete (RAAC) roof which had collapsed in a school.
1 April 2020
CROSS Safety Report
Report ID: 908
Region: CROSS-UK, CROSS-AUS, CROSS-US