Safety information search results
Filter your results
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 4 (2)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 58 (2)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK [sub-heading only] (7)
- CROSS Newsletter (6)
- CROSS Safety Report (16)
- News [sub-heading only] (1)
CROSS regions
Accidental partial demolition of a beam
During a site visit, the permanent works design engineer noticed that hydro-demolition of the end of a floor supporting beam had taken place out of sequence. This introduced a pattern of bending moments and shear forces that were not considered in the original design.
6 April 2023
CROSS Safety Report
Report ID: 855
Region: CROSS-UK
Missing starter bars
During an inspection the reporter observed that all the continuity starter bars projecting from the wall kicker were in fact loose.
1 July 2007
CROSS Safety Report
Report ID: 37
Region: CROSS-UK
Stability compromised in school hall
A reporter highlights construction issues that occurred during the construction of a new school hall.
1 January 2012
CROSS Safety Report
Report ID: 242
Region: CROSS-UK
Split responsibilities on temporary bracing of steelwork
A contractor removed temporary bracing on site prior to the structure being in a permanent stable state.
1 July 2010
CROSS Safety Report
Report ID: 204
Region: CROSS-UK
Inadequate foundation reinforcement
Subcontractors carrying out the ground works for a multi-storey development failed to provide sufficient continuity reinforcement in the ground beams.
1 October 2008
CROSS Safety Report
Report ID: 112
Region: CROSS-UK
Missing rebar identified prior to concrete slab pour
A reporter describes how they often encounter issues such as missing reinforcement while carrying out pre-pour inspections.
1 January 2013
CROSS Safety Report
Report ID: 310
Region: CROSS-UK
Poor quality of construction and lack of supervision on a block of flats
Concerns are raised over poor quality construction and a lack of supervision on a residential block of flats.
1 July 2017
CROSS Safety Report
Report ID: 672
Region: CROSS-UK
Inadequate bolted connections supporting stairs
Concerns are raised over the safe design and installation of rolled steel angles (RSA) used to support heavy precast stair and landing units.
1 April 2017
CROSS Safety Report
Report ID: 615
Region: CROSS-UK
Changes in temporary works scheme
Changes in the construction programme on site led to the construction of the superstructure of a building, without the liner wall below it being completed.
1 April 2017
CROSS Safety Report
Report ID: 603
Region: CROSS-UK
Design responsibility for temporary stability of steel frame building
A reporter raises concerns about the division of responsibility for the temporary stability of a four-storey steel frame structure with precast concrete planks and a structural topping.
1 April 2019
CROSS Safety Report
Report ID: 789
Region: CROSS-UK
Submit a report
Your report will make a difference. It will help to create positive change and improve safety.
Our secure and confidential safety reporting system gives professionals the opportunity to share their experiences to help others.