Safety information search results
Filter your results
Building height
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 13 (1)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 20 (2)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK [sub-heading only] (22)
- CROSS Newsletter (8)
- CROSS Safety Report (26)
- News [sub-heading only] (7)
CROSS regions
Collapse of a wall during construction
An internal corridor wall collapsed in a school under construction.
1 April 2008
CROSS Safety Report
Report ID: 99
Region: CROSS-UK
Advice wanted by amateur builder
This notice, seen by a reporter, was posted on a DIY website, and whilst it may be apocryphal, it illustrates the type of queries received by local authorities and building regulations officers.
1 January 2009
CROSS Safety Report
Report ID: 125
Region: CROSS-UK
Inadequate chimney support
The supports for a domestic chimney had been removed which left a 2.5m high chimney stack almost unsupported and in a potentially dangerous state.
1 April 2009
CROSS Safety Report
Report ID: 131
Region: CROSS-UK
Masonry fall due to high wind
A five block high masonry wall collapsed during high winds.
1 January 2012
CROSS Safety Report
Report ID: 295
Region: CROSS-UK
Failure to check designs produced by software
Concerns were raised about a proprietary design software after a building control officer noticed a regular error appearing while checking calculations provided to them.
1 January 2016
CROSS Safety Report
Report ID: 538
Region: CROSS-UK
Incomplete casting of composite brick/concrete parapets
A reporter states that during a parapet raising scheme over a mainline railway, a void up to 300mm deep was identified below existing coping bed level.
1 January 2018
CROSS Safety Report
Report ID: 635
Region: CROSS-UK
Unsafe removal of internal walls
A reporter was requested to advise on the removal of some internal walls in a decades’ old multi storey block of council flats after they were removed.
1 October 2018
CROSS Safety Report
Report ID: 714
Region: CROSS-UK
Fixing systems for gravestones
This report is about the safety of pins used to hold headstones in place.
1 October 2016
CROSS Safety Report
Report ID: 601
Region: CROSS-UK
Viaduct survey concerns
A reporter raises concerns about a small four span brickwork railway viaduct that has been degrading for some time.
1 January 2014
CROSS Safety Report
Report ID: 346
Region: CROSS-UK
Lack of masonry wall ties causes failure
A reporter states that they have come across the presence of serious defects in masonry construction in the past and have no doubt that many other engineers have had similar experiences.
1 April 2018
CROSS Safety Report
Report ID: 665
Region: CROSS-UK