Safety information search results
Filter your results
Building or structure type
Building height
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 3 (1)
- CROSS-AUS Newsletter 4 (1)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (6)
- CROSS Newsletter (6)
- CROSS Safety Alert (1)
- CROSS Safety Report (18)
CROSS regions
Asymmetric bridge design and construction – a near miss
During the construction stage of an arch footbridge a design error was identified that had been indirectly revealed by an associated error in construction.
1 October 2011
CROSS Safety Report
Report ID: 262
Region: CROSS-UK
GRP panels as permanent shuttering
A reporter highlights problems that were encountered when Glassfibre Reinforced Plastic (GRP) panels were used as permanent formwork on a highway construction project.
1 October 2012
CROSS Safety Report
Report ID: 342
Region: CROSS-UK
Quality of design and construction of a major bridge structure
This report concerns the design and installation of the bridge bearing zones on a new prestressed precast concrete viaduct.
1 October 2018
CROSS Safety Report
Report ID: 781
Region: CROSS-UK
Dislodged finger plate on highway bridge
A correspondent received a report about a 1.5m long section of a steel finger plate expansion joint on a highway bridge that had been inadequately fixed and became dislodged.
1 February 2020
CROSS Safety Report
Report ID: 879
Region: CROSS-AUS
Emergency motorway lane closure during concrete repairs
This report highlights how confusion during concrete repair works led to an unplanned emergency lane closure of a bridge carrying a motorway.
1 July 2020
CROSS Safety Report
Report ID: 926
Region: CROSS-UK
Inspection and maintenance of Super-T bridge girders
Doubts exist about the durability and maintenance of bridge Super-T girders as a result of lack of access for inspection of sealed internal cavities.
1 August 2020
CROSS Safety Report
Report ID: 956
Region: CROSS-AUS
Spalling concrete falling from motorway bridge
A major infrastructure owner reports on how an incident occurred at a motorway overbridge resulting in a piece of spalling concrete falling onto the carriageway and striking a vehicle.
1 October 2015
CROSS Safety Report
Report ID: 524
Region: CROSS-UK
Fall of material from bridge soffit
Several reports about materials falling from bridges have been sent by a bridge owner.
1 July 2016
CROSS Safety Report
Report ID: 549
Region: CROSS-UK
Defects found in previously repaired bridge
While carrying out strengthening work on a bridge, there was concern that by removing the non-structural encasement, alternative load paths had been removed.
1 April 2016
CROSS Safety Report
Report ID: 564
Region: CROSS-UK
Responsibilities for hybrid concrete construction
Concerns are raised after a substantial precast element, weighing over 10t, had been placed in position and used as part of the shuttering for an in-situ pour without it being designed to act as a shutter.
1 October 2016
CROSS Safety Report
Report ID: 574