Safety information search results
Filter your results
Building or structure type
Building height
Project or lifecycle stage
Design
Operation or occupation
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (1)
- Assessment project [sub-heading only] (3)
- Construction project [sub-heading only] (31)
- Demolition project (1)
- Excavation (2)
- Extension project (1)
- Groundworks project (2)
- New build (9)
- Refurbishment (2)
- Remediation project (2)
- Repair project (3)
- Strengthening project (5)
- Structural assessment (4)
Method of construction
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 28 (4)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 40 (2)
- CROSS-UK Newsletter 42 (2)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK Newsletter 67 (3)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (22)
- CROSS Newsletter (18)
- CROSS Safety Alert (1)
- CROSS Safety Report (56)
- CROSS Topic Paper (3)
- News [sub-heading only] (2)
- Third party content (1)
CROSS regions
Further example of incorrect finite element modelling
Concerns in respect of the sufficiency of finite element modelling of masonry walls as part of a reinforced concrete framed building.
20 February 2023
CROSS Safety Report
Report ID: 1145
Region: CROSS-UK
Wrong length blind bolts lead to unsafe bridge structure
Bridge strengthening being carried out using blind bolts left a structure in an unsafe condition with traffic loading on it.
20 February 2023
CROSS Safety Report
Report ID: 1185
Region: CROSS-UK
Corrosion concerns on a pedestrian bridge
A reporter is concerned about a pedestrian bridge that may have reduced load capacity due to corrosion at the root of cantilever supports.
17 February 2023
CROSS Safety Report
Report ID: 1161
Region: CROSS-UK
Concern about rebending starter bars
This report concerns the bending and rebending of starter bars on site during the construction of a multi storey tower. The reporter considered that such a practice could compromise the structure under extreme load conditions.
24 May 2023
CROSS Safety Report
Report ID: 1164
Region: CROSS-UK
Cantilever bridge parapet falsework failure
A reporter has experienced the failure of cantilever parapet falsework twice, for different reasons, using two different products during bridge construction.
20 February 2023
CROSS Safety Report
Report ID: 1159
Region: CROSS-UK
Inadequate bridge bearing pad installation
During the final construction phase of a reinforced concrete bridge deck, the contractor installed the elastomeric bridge bearing pads using a non-approved and potentially dangerous methodology.
28 March 2023
CROSS Safety Report
Report ID: 828
Region: CROSS-UK
Lessons learned from the 2018 Florida bridge collapse during construction
This was a bridge of an unusual design and was being constructed in an unusual manner. The main 53m pre-stressed pre-cast concrete span truss was in position when cracks appeared at a node and over a period of almost three weeks they visibly worsened until collapse occurred.
1 December 2020
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Corrosion of steel truss footbridge
Severe corrosion was found in a steel truss footbridge during a planned examination.
23 May 2022
CROSS Safety Report
Report ID: 774
Region: CROSS-UK
Precast concrete panel fixing
A 1960s flyover was being demolished and an interesting feature came to light how the precast concrete edge panels were fixed.
30 June 2022
CROSS Safety Report
Report ID: 965
Region: CROSS-UK
Painted faying surfaces leads to connections with insufficient load capacity
Painted, rather than the required unpainted connection faying surfaces, were identified by the Resident Engineer of a reporter's firm during the erection of a primary frame for a large project. The painted surfaces resulted in the connections not having sufficient load carrying capacity and necessitated remedial works.
20 November 2023
CROSS Safety Report
Report ID: 896
Region: CROSS-UK