Safety information search results
Filter your results
Building or structure type
- (-)
Buildings
(141)
- Agricultural buildings (2)
- Car parks (2)
- Commercial (10)
- Consequence Class 3 buildings (2)
- Education, science & art buildings (5)
- Health care (2)
- Higher-risk buildings (2)
- Industrial buildings (4)
- Public, religious & civic buildings (4)
- Recreational buildings (2)
- Residential (40)
- Stadiums (1)
- Storage buildings (3)
- Tall buildings (10)
- Theatres & other entertainment buildings (2)
- Transport buildings (1)
- Freestanding walls (2)
- Retaining structures (4)
- Temporary structures (3)
Materials
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (13)
- Assessment project [sub-heading only] (6)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (68)
- Demolition project (3)
- Excavation (4)
- Extension project (7)
- Fire safety assessment (1)
- New build (45)
- Refurbishment (2)
- Remediation project (5)
- Repair project (1)
- Strengthening project (2)
- Structural assessment (9)
Method of construction
Elements & systems
- Balconies (7)
- Balustrades (7)
- Basements (7)
- Beams (26)
- Bracing (10)
- Canopies (3)
- Ceilings (7)
- Cladding (12)
- Columns (16)
- Fasteners & connections (34)
- Fences (1)
- Fire exit doors (1)
- Fire protection (6)
- Foundations (4)
- Insulation (3)
- Light gauge steel framing (1)
- Padstones (2)
- Parapets (1)
- Roofs (17)
- Shear walls (1)
- Slabs (11)
- Trusses (2)
- Walls (20)
- Wall ties (2)
- Wind posts (1)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Locations
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 2 (1)
- CROSS-UK Newsletter 23 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 29 (2)
- CROSS-UK Newsletter 30 (3)
- CROSS-UK Newsletter 31 (5)
- CROSS-UK Newsletter 32 (4)
- CROSS-UK Newsletter 33 (4)
- CROSS-UK Newsletter 34 (4)
- CROSS-UK Newsletter 35 (4)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 37 (5)
- CROSS-UK Newsletter 38 (4)
- CROSS-UK Newsletter 39 (4)
- CROSS-UK Newsletter 40 (4)
- CROSS-UK Newsletter 41 (6)
- CROSS-UK Newsletter 42 (4)
- CROSS-UK Newsletter 43 (4)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (4)
- CROSS-UK Newsletter 46 (3)
- CROSS-UK Newsletter 47 (6)
- CROSS-UK Newsletter 48 (6)
- CROSS-UK Newsletter 49 (6)
- CROSS-UK Newsletter 50 (6)
- CROSS-UK Newsletter 51 (6)
- CROSS-UK Newsletter 52 (3)
- CROSS-UK Newsletter 53 (3)
- CROSS-UK Newsletter 54 (6)
- CROSS-UK Newsletter 55 (2)
- CROSS-UK Newsletter 59 (4)
- CROSS-UK Newsletter 60 (6)
- CROSS-UK Newsletter 61 (3)
- CROSS-UK Newsletter 64 (9)
- CROSS-UK Newsletter 65 (4)
- CROSS-UK [sub-heading only] (115)
- (-) CROSS Newsletter (141)
- CROSS Safety Report (141)
- News [sub-heading only] (18)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (1)
CROSS regions
Brick wall removed to leave precast panels unsupported
Precast concrete slabs were left unsupported after a supporting brick wall was removed during demolition works.
1 July 2014
CROSS Safety Report
Report ID: 384
Region: CROSS-UK
Lightweight steel roof partial collapse
A hall constructed from thin cold rolled steel sections riveted together started collapsing when tiles were loaded on one side only.
1 April 2014
CROSS Safety Report
Report ID: 383
Region: CROSS-UK
Inadequate steel beam splice
A reporter raises concerns of an inadequate steel beam splice they came across on site.
1 October 2013
CROSS Safety Report
Report ID: 343
Region: CROSS-UK
Adjacent excavations in Australia
In parts of Australia, says a reporter, deep excavations in clay and sandy materials have caused damage to adjacent property and to existing buildings founded on high level footings.
1 July 2013
CROSS Safety Report
Report ID: 360
Region: CROSS-UK
Boom MEPW falls through precast planks
A high injury potential near-miss (near hit) incident occurred when a mobile elevated working platform (MEPW) fell through a floor at a point where there was a notched precast plank.
1 April 2013
CROSS Safety Report
Report ID: 359
Region: CROSS-UK
Substitution of undersize steel sections
A reporter feels it is necessary to report a similar but more basic problem on the failure of certified steel products.
1 October 2013
CROSS Safety Report
Report ID: 369
Region: CROSS-UK
Retaining wall excavation collapse
A 6m deep excavation formed for constructing a retaining wall on a domestic project collapsed due to insufficient propping.
1 July 2019
CROSS Safety Report
Report ID: 800
Region: CROSS-UK
Inadequate structural design on industrial steel structures
A reporter's firm believes that steel structures associated with plant are being erected without a design being carried out by a structural engineer and are therefore potentially dangerous.
1 April 2019
CROSS Safety Report
Report ID: 804
Region: CROSS-UK
Fixing brackets for glazing systems
A reporter's organisation has been alerted to several cases of broken glass panels in a canopy at a transportation facility.
1 January 2019
CROSS Safety Report
Report ID: 802
Region: CROSS-UK
High winds cause masonry parapet failure
A reporter highlights how exceptionally strong winds caused a fourth-floor level masonry parapet wall with a 1.7m high timber fencing on top of it to collapse.
1 April 2019
CROSS Safety Report
Report ID: 803
Region: CROSS-UK