Safety information search results
Filter your results
Building or structure type
- Bridges (1)
- (-)
Buildings
(143)
- Agricultural buildings (6)
- Car parks (10)
- Commercial (13)
- Education, science & art buildings (14)
- Health care (3)
- Higher-risk buildings (3)
- Industrial buildings (6)
- LPS buildings (2)
- Public, religious & civic buildings (6)
- Recreational buildings (6)
- Residential (30)
- Stadiums (1)
- Storage buildings (6)
- Tall buildings (7)
- Theatres & other entertainment buildings (5)
- Transport buildings (4)
- Freestanding walls (3)
- Masts & towers (1)
- Railways (2)
- Retaining structures (2)
- Roads (1)
- Temporary structures (1)
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (10)
- Assessment project [sub-heading only] (12)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (32)
- Excavation (1)
- Fire safety assessment (1)
- Maintenance project (2)
- New build (13)
- Refurbishment (6)
- Remediation project (11)
- Repair project (3)
- Structural assessment (18)
Construction period
Method of construction
Structural form
Elements & systems
- Arch (2)
- Balconies (6)
- Balustrades (9)
- Basements (1)
- Beams (7)
- Bracing (4)
- Cables (1)
- Canopies (5)
- Ceilings (18)
- Cladding (18)
- Columns (4)
- Fasteners & connections (45)
- Fences (1)
- Fire exit doors (1)
- Fire protection (2)
- Foundations (2)
- Insulation (6)
- Light gauge steel framing (1)
- Lintels (2)
- Parapets (6)
- PV panels (1)
- Roofs (40)
- Sandwich panels (1)
- Shear walls (1)
- Signs (1)
- Slabs (13)
- Tendons (1)
- Trusses (2)
- Wall head restraints (1)
- Walls (21)
- Wall ties (4)
Temporary works
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 8 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 1 (4)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 5 (3)
- CROSS-UK Newsletter 6 (2)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 10 (5)
- CROSS-UK Newsletter 12 (4)
- CROSS-UK Newsletter 13 (1)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 15 (3)
- CROSS-UK Newsletter 17 (2)
- CROSS-UK Newsletter 20 (2)
- CROSS-UK Newsletter 23 (7)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 26 (3)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 33 (3)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (3)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (2)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 51 (3)
- CROSS-UK Newsletter 52 (2)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 57 (2)
- CROSS-UK Newsletter 58 (2)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (3)
- CROSS-UK Newsletter 62 (3)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK Newsletter 67 (2)
- CROSS-UK [sub-heading only] (75)
- CROSS-US Newsletter 1 (1)
- CROSS-US Newsletter 3 (3)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (35)
- CROSS Safety Alert (1)
- CROSS Safety Report (136)
- CROSS Theme Page (1)
- CROSS Topic Paper (2)
- News [sub-heading only] (12)
- Safety information from CROSS [sub-heading only] (1)
- Safety information [sub-heading only] (2)
- Third party content (3)
- Third party content (3)
CROSS regions
Reinforced autoclaved aerated concrete in roofing in schools
This document is for building owners to help them to identify the presence of reinforced autoclaved aerated concrete (RAAC) and to check whether any further investigation or action is needed.
10 February 2021
Third party content
Publisher: Department for Education
Storm damage to pressed metal roof covering
A modern dwelling with two separate V-shaped roofs sustained damage to the standing seam pressed metal roof covering during two separate weather events.
23 February 2024
CROSS Safety Report
Report ID: 952
Region: CROSS-UK
Failure of vertical bracing system in coffee shop
A reporter noticed that a bolt at a low level connecting node of the vertical bracing system in a public building had failed.
30 June 2022
CROSS Safety Report
Report ID: 759
Region: CROSS-UK