Safety information search results
Filter your results
Building or structure type
- Buildings
(19)
- Agricultural buildings (1)
- Car parks (2)
- (-) Commercial (20)
- Education, science & art buildings (3)
- Health care (2)
- Industrial buildings (2)
- Laboratory buildings (1)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (1)
- Recreational buildings (1)
- Residential (7)
- Stadiums (1)
- Tall buildings (1)
- Theatres & other entertainment buildings (2)
- Transport buildings (1)
- Railways (1)
Products
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Content type
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 31 (2)
- CROSS-UK Newsletter 32 (2)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK [sub-heading only] (9)
- CROSS-US Newsletter 2 (2)
- CROSS-US [sub-heading only] (2)
- CROSS Newsletter (6)
- CROSS Safety Report (19)
- CROSS Topic Paper (1)
- News [sub-heading only] (2)
CROSS regions
Punching shear in concrete slabs at perimeter columns
A reporter raises concerns about the underestimation of bending moments in perimeter columns when assessing punching shear in adjacent concrete slabs. Punching shear failures can be brittle and catastrophic. Designers need to include the appropriate ultimate moment in the design actions.
14 October 2022
CROSS Safety Report
Report ID: 1122
Region: CROSS-AUS
Inadequate design and procurement of large steel roof structure
This report demonstrates the importance of following the correct process for project procurement, including preparing a detailed design and project specification, and certificating compliance with the relevant building codes. It also covers the potential consequences when shortcuts are taken.
30 March 2023
CROSS Safety Report
Report ID: 1123
Region: CROSS-AUS
Metal cladding panels fail and fall to ground
During high winds, a number of metal cladding panels failed and fell to the ground from a tall commercial building in a major UK city.
26 August 2022
CROSS Safety Report
Report ID: 1134
Region: CROSS-UK
Concerns about punching shear in a flat slab
This report concerns potential shear failures in flat slabs. This originates from inconsistent design and detailing of the shear reinforcement where a proprietary shear link system is assumed in the design but not followed in detailing.
13 December 2021
CROSS Safety Report
Report ID: 1050
Region: CROSS-UK
Insufficient design fees
A reporter raises concerns over design fees that were below typical market rates.
1 April 2010
CROSS Safety Report
Report ID: 190
Region: CROSS-UK
Elliot Lake mall collapse
In June 2012 part of the roof of a thirty two year old Mall in Ontario, Canada collapsed killing two people and injuring nineteen.
1 December 2014
CROSS Topic Paper
Region: CROSS-UK
No structural design for steel portal frame building
A reporter is concerned that, in some cases, no structural design is carried out for steel portal framed buildings.
1 January 2020
CROSS Safety Report
Report ID: 866
Region: CROSS-UK
Fire protection of mixed hot/cold rolled steel structure
This report describes how a high-rise building had to be remediated after it was found there was insufficient fire protection encasement of structural elements.
1 July 2020
CROSS Safety Report
Report ID: 921
Region: CROSS-UK
Failure of existing long-span wood roof truss following installation of new roof-top HVAC units
Failure of an existing long-span wood roof truss following installation of new roof-top Heating, Ventilating, and Air Conditioning (HVAC) units offers lessons in the special challenges of renovations to existing buildings.
1 September 2020
CROSS Safety Report
Report ID: 949
Region: CROSS-US
Bottom-chord bracing for metal plate-connected wood trusses used in light-commercial applications
Concerns regarding metal plate-connected wood trusses in light-commercial construction when subject to net uplift.
1 September 2020
CROSS Safety Report
Report ID: 985
Region: CROSS-US