Safety information search results
Filter your results
Building or structure type
- Buildings
(141)
- Agricultural buildings (2)
- Car parks (2)
- Commercial (16)
- Education, science & art buildings (11)
- Health care (11)
- Higher-risk buildings (6)
- Industrial buildings (5)
- Laboratory buildings (1)
- LPS buildings (2)
- Nuclear & energy buildings (1)
- Public, religious & civic buildings (4)
- Recreational buildings (4)
- (-) Residential (143)
- Stadiums (1)
- Tall buildings (12)
- Theatres & other entertainment buildings (2)
- Transport buildings (2)
- Railways (1)
- Retaining structures (2)
- Temporary structures (1)
Materials
Project or lifecycle stage
Design
Codes, standards & regulations
Fire incident response
Project type
- Alteration & conversion project (25)
- Assessment project [sub-heading only] (3)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (58)
- Demolition project (1)
- Excavation (3)
- Extension project (14)
- Fire safety assessment (1)
- Maintenance project (2)
- New build (27)
- Refurbishment (9)
- Remediation project (9)
- Repair project (3)
- Strengthening project (2)
- Structural assessment (4)
- Underpinning project (3)
Method of construction
Elements & systems
- Balconies (9)
- Balustrades (6)
- Basements (4)
- Beams (21)
- Bracing (5)
- Canopies (2)
- Ceilings (1)
- Cladding (7)
- Columns (9)
- Fasteners & connections (18)
- Fire protection (5)
- Foundations (2)
- Insulation (4)
- Light gauge steel framing (3)
- Lintels (3)
- Padstones (4)
- PV panels (1)
- Roofs (15)
- Shear walls (1)
- Slabs (6)
- Trusses (2)
- Wall head restraints (1)
- Walls (30)
- Wall ties (3)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Content type
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 6 (2)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 13 (3)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 18 (2)
- CROSS-UK Newsletter 21 (3)
- CROSS-UK Newsletter 23 (2)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 37 (3)
- CROSS-UK Newsletter 38 (2)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (3)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (3)
- CROSS-UK Newsletter 50 (2)
- CROSS-UK Newsletter 51 (2)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 55 (3)
- CROSS-UK Newsletter 57 (2)
- CROSS-UK Newsletter 58 (3)
- CROSS-UK Newsletter 59 (1)
- CROSS-UK Newsletter 60 (3)
- CROSS-UK Newsletter 61 (1)
- CROSS-UK Newsletter 62 (3)
- CROSS-UK Newsletter 64 (5)
- CROSS-UK Newsletter 65 (5)
- CROSS-UK Newsletter 67 (3)
- CROSS-UK Newsletter 68 (5)
- CROSS-UK [sub-heading only] (57)
- CROSS Feature Article (1)
- CROSS Newsletter (41)
- CROSS Safety Report (142)
- News [sub-heading only] (10)
CROSS regions
Timber roof truss bracing problem
Lateral movement of the roof tiles on a two-storey mid-terrace house built approximately 35 years ago with a trussed rafter roof led to the discovery of broken bracing.
1 July 2014
CROSS Safety Report
Report ID: 354
Region: CROSS-UK
Dangerous snow slides from 100 houses
A reporter raises concerns about the build up of snow on cold roof systems.
1 July 2011
CROSS Safety Report
Report ID: 246
Region: CROSS-UK
Lack of control on site when underpinning
The concern is in relation to the sequencing of construction and the lack of control on site from competent persons during underpinning works.
1 October 2011
CROSS Safety Report
Report ID: 241
Region: CROSS-UK
Gain in strength of mortar slower than concrete
A masonry wall settled and cracked after four courses of Engineering grade B bricks were substituted (not by the designer) for the original in-situ concrete padstones on cost and handling grounds.
1 April 2010
CROSS Safety Report
Report ID: 177
Region: CROSS-UK
Insufficient design fees
A reporter raises concerns over design fees that were below typical market rates.
1 April 2010
CROSS Safety Report
Report ID: 190
Region: CROSS-UK
Role of approved inspectors
A reporter whose firm is involved in a partially built project worth £6m, where there is defective work and the builder has gone into liquidation, raises concerns over the role of the approved inspector.
1 January 2011
CROSS Safety Report
Report ID: 205
Region: CROSS-UK
Risk in notching timber studs
During the construction of a block of apartments a reporter found a couple of locations on an external fourth floor wall where the load-bearing studs had been notched well past permissible depths.
1 January 2011
CROSS Safety Report
Report ID: 209
Region: CROSS-UK
Need for licensed builders
A reporter feels certain building work should only be carried out by licensed qualified builders.
1 January 2011
CROSS Safety Report
Report ID: 214
Region: CROSS-UK
Snow loading in Scotland - ice load
A reporter’s practice who specialises in remediation have had new instructions on five roof collapses after a period of heavy snowfalls (January 2010).
1 July 2011
CROSS Safety Report
Report ID: 184
Region: CROSS-UK
Alterations to existing buildings with no site visits
A reporter is concerned about structural engineers developing structural calculations and drawings based on the Architects’ drawings only, with no site visits.
1 January 2014
CROSS Safety Report
Report ID: 365
Region: CROSS-UK