Safety information search results
Filter your results
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 35 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 53 (1)
- CROSS-UK Newsletter 56 (1)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK [sub-heading only] (15)
- CROSS Newsletter (10)
- CROSS Safety Report (27)
CROSS regions
Concerns with propping design to large excavations
Concerns are raised about the design of propping to large excavations and particularly about the design of the connections for a raking prop to a horizontal waler.
1 January 2019
CROSS Safety Report
Report ID: 298
Region: CROSS-UK
Set up of temporary works
This report highlights the importance of following correct procedures when installing temporary works.
1 July 2019
CROSS Safety Report
Report ID: 797
Region: CROSS-AUS
Mobile scaffold tower falls 7 storeys
A mobile tower, which was not being used, toppled over the guardrail and fell 7 storeys (27m) to the ground.
1 April 2014
CROSS Safety Report
Report ID: 436
Region: CROSS-UK
Failure of precast concrete 'L' shaped retaining wall
A recent incident occurred on a site, where a temporary precast retaining wall failed leading to a pile of clay approximately 3m high spilling through the wall.
1 July 2014
CROSS Safety Report
Report ID: 433
Region: CROSS-UK
Failure of epoxy resin bonded anchors in concrete
A reporter expresses concern about adhesive bonded anchors after anchors failed progressively on site during a lifting operation.
1 April 2014
CROSS Safety Report
Report ID: 429
Region: CROSS-UK
Failure of anchor bolts holding suspended scaffold
During the removal of a suspended scaffold, it was found that a number of the screw bolt anchors had failed.
1 July 2015
CROSS Safety Report
Report ID: 430
Region: CROSS-UK
Unsafe timber scaffolding
Concerns were raised after a reporter observed a rickety temporary scaffold that had been constructed from 4”x2” (100mm x 50mm) timbers.
1 April 2014
CROSS Safety Report
Report ID: 407
Region: CROSS-UK
Unstable site hoarding on unattended site
The reporter is aware of unsafe hoarding that surrounds a partially developed site that has been left unattended following the economic downturn.
1 January 2014
CROSS Safety Report
Report ID: 413
Region: CROSS-UK
Sudden hole in piling mat
A reporter describes how a 450mm diameter hole appeared in a piling mat whilst digging a trench that was 0.5m away.
1 April 2016
CROSS Safety Report
Report ID: 566
Region: CROSS-UK
Scaffold support overturns
A 5m high support scaffold screened with fabric overturned when airflow was introduced to a building.
1 January 2017
CROSS Safety Report
Report ID: 575
Region: CROSS-UK