Safety information search results
Filter your results
Building or structure type
Products
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (1)
- Assessment project [sub-heading only] (1)
- Conservation & restoration project (1)
- Construction project [sub-heading only] (14)
- Demolition project (1)
- Excavation (1)
- Extension project (1)
- Groundworks project (1)
- New build (7)
- Refurbishment (1)
- Remediation project (1)
- Repair project (1)
- Structural assessment (2)
Construction period
Method of construction
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Locations
Content type
- CROSS-UK Newsletter 23 (1)
- CROSS-UK Newsletter 28 (1)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 32 (2)
- CROSS-UK Newsletter 36 (2)
- CROSS-UK Newsletter 42 (2)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (3)
- CROSS-UK Newsletter 49 (4)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 54 (3)
- CROSS-UK Newsletter 59 (4)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 64 (1)
- CROSS-UK [sub-heading only] (25)
- (-) CROSS Newsletter (28)
- CROSS Safety Report (28)
- News [sub-heading only] (3)
CROSS regions
Unauthorised structural alterations to accommodate drainpipes
A reporter became aware of cases where main structural steel sections were ‘butchered’ on site to accommodate drainpipes.
1 July 2020
CROSS Safety Report
Report ID: 902
Region: CROSS-UK
Fire protection of mixed hot/cold rolled steel structure
This report describes how a high-rise building had to be remediated after it was found there was insufficient fire protection encasement of structural elements.
1 July 2020
CROSS Safety Report
Report ID: 921
Region: CROSS-UK
Consequences of low professional fees
An engineer believes that despite public concerns about workmanship issues on site, low professional fees mean that engineers are not able to adequately check the work on site.
1 July 2020
CROSS Safety Report
Report ID: 905
Region: CROSS-UK
Emergency motorway lane closure during concrete repairs
This report highlights how confusion during concrete repair works led to an unplanned emergency lane closure of a bridge carrying a motorway.
1 July 2020
CROSS Safety Report
Report ID: 926
Region: CROSS-UK
Fire risks in multi-storey car parks
A reporter is concerned by the reluctance of the industry to voluntarily take on board and proactively react to the lessons learnt from the fire at the Echo Arena car park in Liverpool.
14 October 2020
CROSS Safety Report
Report ID: 940
Region: CROSS-UK
Actively seeking to identify hazards
A reporter investigating a near miss incident raises concerns that an active prompt to seek out hazards is not being undertaken on innovative construction design and methods.
1 April 2016
CROSS Safety Report
Report ID: 530
Region: CROSS-UK
Wind loads acting on timber frame walls for designs to BS 5268-6
A reporter says that the masonry shielding factors in BS 5268-6 (K100 and K200) were substantially reduced when PD 6693-1 for designs to EC5 was produced.
1 April 2019
CROSS Safety Report
Report ID: 624
Region: CROSS-UK
Number of near misses and the regulatory regime
A reporter raises concerns about the number of investigations they are working on, or of which they are aware of.
1 January 2017
CROSS Safety Report
Report ID: 612
Region: CROSS-UK
Heritage balustrade complying with current regulations
A reporter is hoping that CROSS might be able to help with some research for a heritage project.
1 January 2017
CROSS Safety Report
Report ID: 599
Region: CROSS-UK
Undermined bridge wing wall collapses
A masonry wing wall of a bridge collapsed and fell as a single section coming to rest against an adjacent pile after being undermined on site.
1 April 2016
CROSS Safety Report
Report ID: 577
Region: CROSS-UK