Safety information search results
Filter your results
Building or structure type
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Method of construction
Structural form
Elements & systems
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Theme pages
Content type
- CROSS-AUS Newsletter 2 (1)
- CROSS-AUS Newsletter 5 (1)
- CROSS-UK Newsletter 1 (2)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (2)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 9 (1)
- CROSS-UK Newsletter 10 (2)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 15 (2)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 18 (4)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 24 (2)
- CROSS-UK Newsletter 29 (1)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 34 (3)
- CROSS-UK Newsletter 35 (3)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 42 (1)
- CROSS-UK Newsletter 44 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 50 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 62 (2)
- CROSS-UK Newsletter 65 (1)
- CROSS-UK [sub-heading only] (42)
- CROSS-US Newsletter 1 (1)
- CROSS-US [sub-heading only] (1)
- CROSS Newsletter (17)
- CROSS Safety Alert (1)
- CROSS Safety Report (64)
- News [sub-heading only] (6)
CROSS regions
Risk in notching timber studs
During the construction of a block of apartments a reporter found a couple of locations on an external fourth floor wall where the load-bearing studs had been notched well past permissible depths.
1 January 2011
CROSS Safety Report
Report ID: 209
Region: CROSS-UK
Stability compromised in school hall
A reporter highlights construction issues that occurred during the construction of a new school hall.
1 January 2012
CROSS Safety Report
Report ID: 242
Region: CROSS-UK
Failed two storey retaining wall
A two storey high retaining wall adjacent to a house collapsed.
1 October 2011
CROSS Safety Report
Report ID: 240
Region: CROSS-UK
Lack of control on site when underpinning
The concern is in relation to the sequencing of construction and the lack of control on site from competent persons during underpinning works.
1 October 2011
CROSS Safety Report
Report ID: 241
Region: CROSS-UK
Critical wall failure
There has been a report about the top triangle of a brickwork gable in a relatively modern building collapsing in high winds and very seriously injuring two passers-by.
1 July 2009
CROSS Safety Report
Report ID: 135
Region: CROSS-UK
Concerns on stability require prompt action
A reporter was concerned about overall building stability during an extension and conversion project.
1 January 2010
CROSS Safety Report
Report ID: 171
Region: CROSS-UK
Collapse of blockwork retaining wall
An 18m length of a 29m long by 140mm thick 2m high dense concrete block retaining wall collapsed hours after being backfilled.
1 October 2009
CROSS Safety Report
Report ID: 162
Region: CROSS-UK
Deadly retaining wall
A blockwork retaining wall, about 2.5 metres high suddenly collapsed causing a fatality.
1 July 2009
CROSS Safety Report
Report ID: 134
Region: CROSS-UK
Shop/domestic building collapse
A two storey corner (end of terrace) property fronting a very busy, narrow major route collapsed during the construction of a new basement.
1 January 2009
CROSS Safety Report
Report ID: 123
Region: CROSS-UK
Wind on internal masonry walls during construction
There has been a generic report from a contractor about internal masonry walls during construction following his experiences of failures.
1 October 2007
CROSS Safety Report
Report ID: 82