Safety information search results
Filter your results
Building or structure type
Building height
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Theme pages
Locations
Content type
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 10 (1)
- CROSS-UK Newsletter 11 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 26 (2)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 33 (3)
- CROSS-UK Newsletter 38 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 43 (1)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 49 (1)
- CROSS-UK [sub-heading only] (19)
- CROSS Newsletter (10)
- CROSS Safety Alert (2)
- CROSS Safety Report (27)
- CROSS Topic Paper (2)
- News [sub-heading only] (3)
CROSS regions
Cladding - the case for improving inspection
A review of SCOSS reports from 1977 - 2000 pointed up the problems relating to design and inspection of cladding, and the difficulties of changing bad and sometimes unsafe practice.
1 May 2000
CROSS Safety Alert
Region: CROSS-UK
Collapse of folded plate timber roof at a school
This report is about a critical safety issue concerning folded timber roofs, in various settings, including over school halls.
18 October 2023
CROSS Safety Report
Report ID: 1160
Region: CROSS-UK
Tension systems and post-drilled fixings
Lining failures occurred in the Boston (Big Dig) tunnel in 2006, in the Balcome rail tunnel in the UK in 2011 and in Japan’s Sasago tunnel (2012); all related to the use of unsuitable fixings.
1 March 2014
CROSS Safety Alert
Region: CROSS-UK, CROSS-AUS, CROSS-US
Temporary movement joint in slabs not installed correctly
Dowels in temporary movement joints for a slab were not installed correctly, impacting the structural behaviour.
29 March 2021
CROSS Safety Report
Report ID: 998
Region: CROSS-UK
Wind damage to secondary elements
A period of storm force winds, with wind speeds approaching design levels, resulted in damage to secondary roofing and cladding elements.
1 July 2006
CROSS Safety Report
Report ID: 42
Region: CROSS-UK
Culvert roof slab failure
A culvert, which carries a river under a busy main road, partially collapsed.
1 April 2008
CROSS Safety Report
Report ID: 97
Region: CROSS-UK
Car park staircase collapse at construction joint
The top flight of a staircase to a multi-storey concrete car park collapsed approximately 10 years after construction.
1 July 2008
CROSS Safety Report
Report ID: 106
Region: CROSS-UK
School ceiling collapse
Five years after installation a school ceiling suddenly collapsed, pulling the original ceiling and battens with it. The collapse affected virtually the full extent of one classroom.
1 July 2009
CROSS Safety Report
Report ID: 130
Region: CROSS-UK
Multi storey car park defects
A reporter has been concerned for some time that there potentially could be another failure similar to Pipers Row in Wolverhampton and raises their concerns.
1 October 2008
CROSS Safety Report
Report ID: 119
Region: CROSS-UK
De la Concorde bridge collapse
On 30th September 2006, the central span of the de la Concorde highway over-bridge in Laval, Canada, suddenly collapsed onto the road below causing 5 fatalities and 6 injuries.
1 June 2008
CROSS Topic Paper
Region: CROSS-UK