Safety information search results
Filter your results
Building or structure type
- Bridges (11)
- Buildings
(75)
- Car parks (1)
- Commercial (3)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (3)
- Industrial buildings (1)
- Public, religious & civic buildings (2)
- Recreational buildings (1)
- Residential (23)
- Stadiums (1)
- Storage buildings (2)
- Tall buildings (3)
- Theatres & other entertainment buildings (5)
- Buried pipes & culverts (1)
- Masts & towers (5)
- Railways (3)
- Retaining structures (8)
- Roads (3)
- Sewers (1)
- Temporary structures (7)
Materials
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Project type
- Alteration & conversion project (8)
- Assessment project [sub-heading only] (1)
- Construction project [sub-heading only] (60)
- Demolition project (3)
- Excavation (5)
- Extension project (3)
- Groundworks project (1)
- New build (32)
- Refurbishment (4)
- Remediation project (1)
- Structural assessment (1)
- Underpinning project (2)
Method of construction
Elements & systems
- Arch (1)
- Balconies (3)
- Balustrades (3)
- Basements (4)
- Beams (20)
- Bracing (5)
- Ceilings (6)
- Cladding (5)
- Columns (9)
- Fasteners & connections (37)
- Fire protection (2)
- Foundations (10)
- Light gauge steel framing (1)
- Lintels (1)
- Padstones (2)
- Parapets (2)
- Roofs (6)
- Signs (1)
- Slabs (6)
- Trusses (2)
- Walls (25)
- Wall ties (3)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-UK Newsletter 2 (3)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (3)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 6 (3)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 9 (4)
- CROSS-UK Newsletter 10 (7)
- CROSS-UK Newsletter 11 (2)
- CROSS-UK Newsletter 12 (2)
- CROSS-UK Newsletter 13 (1)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 16 (3)
- CROSS-UK Newsletter 17 (2)
- CROSS-UK Newsletter 18 (3)
- CROSS-UK Newsletter 19 (4)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 21 (4)
- CROSS-UK Newsletter 22 (3)
- CROSS-UK Newsletter 24 (3)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 28 (4)
- CROSS-UK Newsletter 29 (5)
- CROSS-UK Newsletter 30 (7)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 32 (2)
- CROSS-UK Newsletter 33 (1)
- CROSS-UK Newsletter 34 (3)
- CROSS-UK Newsletter 35 (3)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (3)
- CROSS-UK Newsletter 39 (2)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 43 (3)
- CROSS-UK Newsletter 44 (4)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 46 (3)
- CROSS-UK Newsletter 47 (4)
- CROSS-UK Newsletter 48 (3)
- CROSS-UK Newsletter 49 (5)
- CROSS-UK Newsletter 50 (3)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (3)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (3)
- (-) CROSS-UK [sub-heading only] (133)
- CROSS Newsletter (70)
- CROSS Safety Report (133)
- News [sub-heading only] (17)
CROSS regions
Unstable concrete blocks
A reporter from a consulting firm was called to a site where the blocks in a retaining wall were found to be expanding and falling apart.
1 April 2010
CROSS Safety Report
Report ID: 174
Region: CROSS-UK
Loading reinforced masonry wall
A 2.5m high retaining wall showed signs of movement not long after backfilling, and it was found that the deflection was due to creep in the bed joints of the immature wall.
1 April 2010
CROSS Safety Report
Report ID: 178
Region: CROSS-UK
False CE certificates
This report is about falsified documents in circulation within the EU purporting to be CE certificates.
1 January 2013
CROSS Safety Report
Report ID: 284
Region: CROSS-UK
Licensing of temporary structures
Temporary structures, such as stages, marquees, lighting towers, video screens and the like are erected at a huge number of events in the UK each year. A reporter who inspects many such structures raises concerns that the systems in place for ensuring their stability are not working.
1 January 2012
CROSS Safety Report
Report ID: 276
Region: CROSS-UK
Near collapse of masonry highway bridge
Works adjacent to a masonry arch bridge caused the foundations to subside and damage the bridge beyond repair.
1 October 2012
CROSS Safety Report
Report ID: 286
Region: CROSS-UK
Failed two storey retaining wall
A two storey high retaining wall adjacent to a house collapsed.
1 October 2011
CROSS Safety Report
Report ID: 240
Region: CROSS-UK
Steel connector failures and forged certificates
According to a reporter, some suppliers are receiving components that are accompanied by certificates that are potentially false or forged.
1 July 2012
CROSS Safety Report
Report ID: 254
Region: CROSS-UK
Hoarding incident
A reporter says that under high, but not severe, wind loads a portion of timber hoarding failed and struck site personnel.
1 July 2013
CROSS Safety Report
Report ID: 278
Region: CROSS-UK
Concern about faulty self-certification of new installation
A reporter’s client had work done in a domestic property by a specialist contractor who was registered under a self-certification Competent Person’s Scheme (CPS) but the work was faulty.
1 April 2012
CROSS Safety Report
Report ID: 263
Region: CROSS-UK
New basements beneath existing properties
A reporter is concerned about the construction of some basements in London.
1 April 2013
CROSS Safety Report
Report ID: 297
Region: CROSS-UK