Safety information search results
Filter your results
Building or structure type
- Bridges (14)
- Buildings
(110)
- Car parks (2)
- Commercial (4)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (4)
- Health care (1)
- Industrial buildings (1)
- Public, religious & civic buildings (3)
- Recreational buildings (1)
- Residential (36)
- Stadiums (1)
- Storage buildings (2)
- Tall buildings (2)
- Theatres & other entertainment buildings (5)
- Transport buildings (1)
- Buried pipes & culverts (2)
- Masts & towers (8)
- Railways (3)
- Retaining structures (9)
- Roads (4)
- Sewers (1)
- Temporary structures (12)
Materials
Project or lifecycle stage
Design
Operation or occupation
Fire incident response
Project type
- Alteration & conversion project (11)
- Assessment project [sub-heading only] (1)
- Construction project [sub-heading only] (82)
- Demolition project (4)
- Excavation (5)
- Extension project (3)
- Groundworks project (1)
- New build (42)
- Refurbishment (6)
- Remediation project (3)
- Structural assessment (1)
- Underpinning project (3)
Method of construction
Elements & systems
- Arch (1)
- Balconies (5)
- Balustrades (3)
- Basements (4)
- Beams (27)
- Bracing (6)
- Cables (1)
- Ceilings (8)
- Cladding (8)
- Columns (12)
- Fasteners & connections (53)
- Fire protection (3)
- Foundations (18)
- Insulation (1)
- Light gauge steel framing (1)
- Lintels (2)
- Padstones (3)
- Parapets (1)
- Roofs (9)
- Signs (1)
- Slabs (9)
- Trusses (2)
- Wall head restraints (3)
- Walls (38)
- Wall ties (6)
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Project delivery methods
Business practice
Public incidents
Locations
Content type
- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 2 (3)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (2)
- CROSS-UK Newsletter 5 (2)
- CROSS-UK Newsletter 6 (3)
- CROSS-UK Newsletter 7 (1)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 9 (4)
- CROSS-UK Newsletter 10 (7)
- CROSS-UK Newsletter 11 (2)
- CROSS-UK Newsletter 12 (3)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 16 (3)
- CROSS-UK Newsletter 17 (2)
- CROSS-UK Newsletter 18 (3)
- CROSS-UK Newsletter 19 (4)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 21 (4)
- CROSS-UK Newsletter 22 (3)
- CROSS-UK Newsletter 24 (3)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 28 (4)
- CROSS-UK Newsletter 29 (5)
- CROSS-UK Newsletter 30 (7)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 32 (2)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 34 (3)
- CROSS-UK Newsletter 35 (4)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (2)
- CROSS-UK Newsletter 38 (3)
- CROSS-UK Newsletter 39 (2)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 43 (3)
- CROSS-UK Newsletter 44 (4)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 46 (4)
- CROSS-UK Newsletter 47 (4)
- CROSS-UK Newsletter 48 (4)
- CROSS-UK Newsletter 49 (5)
- CROSS-UK Newsletter 50 (3)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (3)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK Newsletter 59 (3)
- CROSS-UK Newsletter 62 (2)
- CROSS-UK Newsletter 68 (1)
- CROSS-UK [sub-heading only] (132)
- CROSS Newsletter (73)
- CROSS Safety Alert (1)
- CROSS Safety Report (185)
- News [sub-heading only] (18)
CROSS regions
Defective imported scaffold ties
On a contract where multi lift access scaffolds had been installed for a period of up to 18 months in an exposed coastal location, it was found by a reporter on one of the regular inspections that some of the scaffold ties had failed.
1 April 2011
CROSS Safety Report
Report ID: 230
Region: CROSS-UK
Failed two storey retaining wall
A two storey high retaining wall adjacent to a house collapsed.
1 October 2011
CROSS Safety Report
Report ID: 240
Region: CROSS-UK
Lack of control on site when underpinning
The concern is in relation to the sequencing of construction and the lack of control on site from competent persons during underpinning works.
1 October 2011
CROSS Safety Report
Report ID: 241
Region: CROSS-UK
Scaffold collapse and slipping clips
A photograph has been sent in by a reporter which show a scaffold that collapsed onto a parking area.
1 July 2010
CROSS Safety Report
Report ID: 152
Region: CROSS-UK
Critical wall failure
There has been a report about the top triangle of a brickwork gable in a relatively modern building collapsing in high winds and very seriously injuring two passers-by.
1 July 2009
CROSS Safety Report
Report ID: 135
Region: CROSS-UK
Collapse of tank falsework
This report relates to the collapse of falsework erected to construct an in situ, reinforced concrete, circular water retaining structure.
1 October 2009
CROSS Safety Report
Report ID: 150
Region: CROSS-UK
Divided design responsibilities
A reporter raises concerns after overall responsibility on a project appears to have been apportioned out to individual parties rather than having one structural consultant onboard to pull all the various aspects together.
1 October 2010
CROSS Safety Report
Report ID: 151
Region: CROSS-UK
Temporary bridge jacking
Transport for London (London Rail) reported publically on an incident concerning temporary bridge jacking and permission to reproduce an extract is gratefully acknowledged by CROSS.
1 April 2009
CROSS Safety Report
Report ID: 142
Region: CROSS-UK
Temporary works propping
A reporter raises concerns about the adequacy of temporary works that were installed on site during the refurbishing of a large office building.
1 January 2010
CROSS Safety Report
Report ID: 146
Region: CROSS-UK
Dangerous modification to a column
A reporter was requested to visit a warehouse to inspect work carried out to a main support column that had been modified by a builder.
1 July 2010
CROSS Safety Report
Report ID: 169
Region: CROSS-UK