- CROSS-UK Newsletter 1 (1)
- CROSS-UK Newsletter 2 (2)
- CROSS-UK Newsletter 3 (1)
- CROSS-UK Newsletter 4 (1)
- CROSS-UK Newsletter 5 (1)
- CROSS-UK Newsletter 6 (2)
- CROSS-UK Newsletter 8 (1)
- CROSS-UK Newsletter 9 (4)
- CROSS-UK Newsletter 10 (6)
- CROSS-UK Newsletter 11 (2)
- CROSS-UK Newsletter 12 (2)
- CROSS-UK Newsletter 13 (1)
- CROSS-UK Newsletter 14 (1)
- CROSS-UK Newsletter 15 (1)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 18 (3)
- CROSS-UK Newsletter 19 (2)
- CROSS-UK Newsletter 21 (1)
- CROSS-UK Newsletter 22 (2)
- CROSS-UK Newsletter 24 (2)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 28 (4)
- CROSS-UK Newsletter 30 (2)
- CROSS-UK Newsletter 31 (1)
- CROSS-UK Newsletter 32 (1)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 35 (2)
- CROSS-UK Newsletter 38 (3)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 41 (1)
- CROSS-UK Newsletter 43 (2)
- CROSS-UK Newsletter 44 (2)
- CROSS-UK Newsletter 45 (1)
- CROSS-UK Newsletter 46 (2)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 48 (1)
- CROSS-UK Newsletter 52 (1)
- CROSS-UK [sub-heading only] (63)
- CROSS Newsletter (26)
- CROSS Safety Report (86)
- News [sub-heading only] (11)
CROSS regions
Loading reinforced masonry wall
A 2.5m high retaining wall showed signs of movement not long after backfilling, and it was found that the deflection was due to creep in the bed joints of the immature wall.
1 April 2010
CROSS Safety Report
Report ID: 178
Region: CROSS-UK
Near collapse of masonry highway bridge
Works adjacent to a masonry arch bridge caused the foundations to subside and damage the bridge beyond repair.
1 October 2012
CROSS Safety Report
Report ID: 286
Region: CROSS-UK
Failed two storey retaining wall
A two storey high retaining wall adjacent to a house collapsed.
1 October 2011
CROSS Safety Report
Report ID: 240
Region: CROSS-UK
Steel connector failures and forged certificates
According to a reporter, some suppliers are receiving components that are accompanied by certificates that are potentially false or forged.
1 July 2012
CROSS Safety Report
Report ID: 254
Region: CROSS-UK
Hoarding incident
A reporter says that under high, but not severe, wind loads a portion of timber hoarding failed and struck site personnel.
1 July 2013
CROSS Safety Report
Report ID: 278
Region: CROSS-UK
Concern about faulty self-certification of new installation
A reporter’s client had work done in a domestic property by a specialist contractor who was registered under a self-certification Competent Person’s Scheme (CPS) but the work was faulty.
1 April 2012
CROSS Safety Report
Report ID: 263
Region: CROSS-UK
Piling platform failure
While back screwing an auger, the ground began to fail under the foot of the rig causing it to sink forwards and collapse.
1 January 2012
CROSS Safety Report
Report ID: 271
Region: CROSS-UK
Balcony collapse at block of flats
An in-situ reinforced concrete balcony collapsed at a block of flats which are believed to have been built in the 1960s.
1 January 2014
CROSS Safety Report
Report ID: 341
Region: CROSS-UK
Falsework support to a bridge – a near miss
This report follows the near collapse of a birdcage scaffold falsework structure during an 800 cubic metre concrete pour on a motorway bridge.
1 October 2012
CROSS Safety Report
Report ID: 333
Region: CROSS-UK
Steel stud failures during bridge construction
This report concerns the failure of a steel studs during construction works on a new bridge associated with major road improvements.
1 October 2012
CROSS Safety Report
Report ID: 332
Region: CROSS-UK