Safety information search results
Filter your results
Building or structure type
- Bridges (25)
- Buildings
(144)
- Car parks (4)
- Commercial (8)
- Consequence Class 3 buildings (1)
- Education, science & art buildings (9)
- Health care (2)
- Higher-risk buildings (1)
- Industrial buildings (3)
- Public, religious & civic buildings (5)
- Recreational buildings (5)
- Residential (44)
- Stadiums (1)
- Storage buildings (2)
- Tall buildings (4)
- Theatres & other entertainment buildings (6)
- Transport buildings (3)
- Buried pipes & culverts (2)
- Masts & towers (8)
- Railways (4)
- Retaining structures (12)
- Roads (5)
- Sewers (2)
- Temporary structures (12)
Materials
Project or lifecycle stage
Design
Fire incident response
Project type
- Alteration & conversion project (16)
- Construction project [sub-heading only] (120)
- Demolition project (5)
- Excavation (9)
- Extension project (6)
- Groundworks project (2)
- Maintenance project (1)
- New build (63)
- Refurbishment (6)
- Remediation project (8)
- Repair project (3)
- Strengthening project (2)
- Structural assessment (2)
- Underpinning project (3)
Elements & systems
- Arch (1)
- Balconies (4)
- Balustrades (5)
- Basements (5)
- Beams (35)
- Bracing (9)
- Cables (1)
- Canopies (1)
- Ceilings (13)
- Cladding (17)
- Columns (18)
- Fasteners & connections (81)
- Fire protection (4)
- Foundations (22)
- Insulation (2)
- Light gauge steel framing (2)
- Lintels (2)
- Padstones (3)
- Parapets (2)
- Roofs (11)
- Sandwich panels (1)
- Signs (1)
- Slabs (17)
- Trusses (2)
- Wall head restraints (3)
- Walls (47)
- Wall ties (9)
- Wind posts (1)
Plant & equipment
Utilities
Safety reporting
Project delivery methods
Business practice
Content type
- CROSS-AUS Newsletter 1 (2)
- CROSS-AUS [sub-heading only] (2)
- CROSS-UK Newsletter 1 (3)
- CROSS-UK Newsletter 2 (5)
- CROSS-UK Newsletter 3 (2)
- CROSS-UK Newsletter 4 (4)
- CROSS-UK Newsletter 6 (4)
- CROSS-UK Newsletter 7 (2)
- CROSS-UK Newsletter 8 (2)
- CROSS-UK Newsletter 9 (2)
- CROSS-UK Newsletter 10 (7)
- CROSS-UK Newsletter 11 (3)
- CROSS-UK Newsletter 12 (3)
- CROSS-UK Newsletter 13 (2)
- CROSS-UK Newsletter 14 (2)
- CROSS-UK Newsletter 15 (2)
- CROSS-UK Newsletter 16 (1)
- CROSS-UK Newsletter 17 (1)
- CROSS-UK Newsletter 18 (3)
- CROSS-UK Newsletter 19 (4)
- CROSS-UK Newsletter 20 (1)
- CROSS-UK Newsletter 21 (4)
- CROSS-UK Newsletter 22 (3)
- CROSS-UK Newsletter 24 (3)
- CROSS-UK Newsletter 25 (1)
- CROSS-UK Newsletter 26 (1)
- CROSS-UK Newsletter 27 (1)
- CROSS-UK Newsletter 28 (4)
- CROSS-UK Newsletter 29 (5)
- CROSS-UK Newsletter 30 (6)
- CROSS-UK Newsletter 32 (2)
- CROSS-UK Newsletter 33 (2)
- CROSS-UK Newsletter 34 (2)
- CROSS-UK Newsletter 35 (4)
- CROSS-UK Newsletter 36 (1)
- CROSS-UK Newsletter 37 (3)
- CROSS-UK Newsletter 38 (5)
- CROSS-UK Newsletter 39 (4)
- CROSS-UK Newsletter 40 (2)
- CROSS-UK Newsletter 41 (2)
- CROSS-UK Newsletter 42 (4)
- CROSS-UK Newsletter 43 (3)
- CROSS-UK Newsletter 44 (3)
- CROSS-UK Newsletter 45 (2)
- CROSS-UK Newsletter 46 (6)
- CROSS-UK Newsletter 47 (5)
- CROSS-UK Newsletter 48 (4)
- CROSS-UK Newsletter 49 (4)
- CROSS-UK Newsletter 50 (3)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 52 (4)
- CROSS-UK Newsletter 53 (2)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (4)
- CROSS-UK Newsletter 56 (2)
- CROSS-UK Newsletter 57 (1)
- CROSS-UK Newsletter 58 (4)
- CROSS-UK Newsletter 59 (5)
- CROSS-UK Newsletter 60 (1)
- CROSS-UK Newsletter 62 (1)
- CROSS-UK Newsletter 65 (2)
- CROSS-UK Newsletter 67 (1)
- CROSS-UK Newsletter 68 (2)
- CROSS-UK [sub-heading only] (156)
- CROSS Newsletter (90)
- CROSS Safety Report (243)
- News [sub-heading only] (28)
CROSS regions
Removal of internal structure
The roof trusses, 6m above the ground floor, had been left supported on props made by nailing floor joists together; one at each party wall position.
1 July 2006
CROSS Safety Report
Report ID: 46
Region: CROSS-UK
Local authorities and approved inspectors
A reporter is very concerned that the system of building control where there is competition between local authorities and approved inspectors, has produced a situation where the level of independent inspection has fallen dramatically.
1 July 2007
CROSS Safety Report
Report ID: 67
Region: CROSS-UK
Wind damage to secondary elements
A period of storm force winds, with wind speeds approaching design levels, resulted in damage to secondary roofing and cladding elements.
1 July 2006
CROSS Safety Report
Report ID: 42
Region: CROSS-UK
Collapse of tank falsework
This report relates to the collapse of falsework erected to construct an in situ, reinforced concrete, circular water retaining structure.
1 October 2009
CROSS Safety Report
Report ID: 150
Region: CROSS-UK
Dangerous modification to a column
A reporter was requested to visit a warehouse to inspect work carried out to a main support column that had been modified by a builder.
1 July 2010
CROSS Safety Report
Report ID: 169
Region: CROSS-UK
Concerns on stability require prompt action
A reporter was concerned about overall building stability during an extension and conversion project.
1 January 2010
CROSS Safety Report
Report ID: 171
Region: CROSS-UK
Divided design responsibilities
A reporter raises concerns after overall responsibility on a project appears to have been apportioned out to individual parties rather than having one structural consultant onboard to pull all the various aspects together.
1 October 2010
CROSS Safety Report
Report ID: 151
Region: CROSS-UK
Scaffold collapse and slipping clips
A photograph has been sent in by a reporter which show a scaffold that collapsed onto a parking area.
1 July 2010
CROSS Safety Report
Report ID: 152
Region: CROSS-UK
Fall of bridge deck support due to bolt over-tightening
A 7t steel frame designed to temporarily support part of a bridge deck during bearing refurbishments work fell from height as it was about to be lowered some 21m to the ground.
1 January 2011
CROSS Safety Report
Report ID: 216
Region: CROSS-UK
Defect on site deliberately covered up
A reporter shares an experience they had whilst working for a contractor as an assistant site engineer and provides evidence of the risks associated with the reliance on self-certification of construction.
1 January 2011
CROSS Safety Report
Report ID: 217
Region: CROSS-UK