Safety information search results
Filter your results
Products
Project or lifecycle stage
Operation or occupation
Codes, standards & regulations
Fire incident response
Construction period
Method of construction
Structural form
Temporary works
Plant & equipment
Weather & natural hazards
Utilities
Safety reporting
Organisations
Project delivery methods
Business practice
Risk management
Public incidents
Locations
Content type
- CROSS-AUS Newsletter 1 (1)
- CROSS-AUS [sub-heading only] (1)
- CROSS-UK Newsletter 6 (1)
- CROSS-UK Newsletter 12 (1)
- CROSS-UK Newsletter 19 (1)
- CROSS-UK Newsletter 24 (1)
- CROSS-UK Newsletter 30 (1)
- CROSS-UK Newsletter 37 (1)
- CROSS-UK Newsletter 39 (1)
- CROSS-UK Newsletter 40 (1)
- CROSS-UK Newsletter 46 (1)
- CROSS-UK Newsletter 47 (1)
- CROSS-UK Newsletter 51 (1)
- CROSS-UK Newsletter 54 (1)
- CROSS-UK Newsletter 55 (1)
- CROSS-UK Newsletter 58 (1)
- CROSS-UK [sub-heading only] (14)
- CROSS Newsletter (8)
- CROSS Safety Report (18)
- News [sub-heading only] (3)
CROSS regions
Unauthorised alterations to Light Gauge Steel Framing on site
Concerns were raised after Light Gauge Steel Framing (LGSF) acting as a structural system was trimmed locally on site to accommodate the installation of balcony brackets without approval from the design team.
1 July 2018
CROSS Safety Report
Report ID: 669
Region: CROSS-UK
Poor quality of construction and lack of supervision on a block of flats
Concerns are raised over poor quality construction and a lack of supervision on a residential block of flats.
1 July 2017
CROSS Safety Report
Report ID: 672
Region: CROSS-UK
Dangerous alterations to steel beam supports
A local authority building control officer went to site and witnessed on an upper floor that the columns had been removed out of sequence, before the new frame had been constructed.
1 October 2015
CROSS Safety Report
Report ID: 479
Region: CROSS-UK
Changes in temporary works scheme
Changes in the construction programme on site led to the construction of the superstructure of a building, without the liner wall below it being completed.
1 April 2017
CROSS Safety Report
Report ID: 603
Region: CROSS-UK
Fabrication different from design drawings
A reporter shares their experience of how a propping design they had undertaken was fabricated and installed but not in accordance with the design drawings.
1 July 2015
CROSS Safety Report
Report ID: 513
Region: CROSS-UK
Design responsibility for temporary stability of steel frame building
A reporter raises concerns about the division of responsibility for the temporary stability of a four-storey steel frame structure with precast concrete planks and a structural topping.
1 April 2019
CROSS Safety Report
Report ID: 789
Region: CROSS-UK
Contractor uses incorrect fixing bolts for masonry support angles
A correspondent noticed that proprietary masonry support angles specified to support the outer leaf of masonry had been incorrectly connected to the steel beam using carriage bolts.
1 July 2019
CROSS Safety Report
Report ID: 794
Region: CROSS-UK
Dangerous substitution of lintels on domestic projects
This report highlights the structural risk of substituting lintels during domestic projects without approval from the design engineer.
1 April 2020
CROSS Safety Report
Report ID: 889
Region: CROSS-UK